Quote Number 00022097 ATTACHMENT 2
<br /> O Opportunity Name Harvest Playground
<br /> Quote Name Harvest Playground:Option 2
<br /> Recreation Equipment Quote Date 6/8l2017
<br /> Quote Exp Date 10/31/2017
<br /> Building Community since 1973 Est Lead Time Check with Sales Rep
<br /> Bill To Name Pleasanton Parks Dept,City of Ship To Name Harvest Park
<br /> Bill To P.O.Box 520 Ship To 1401 Harvest Rd
<br /> Pleasanton,California 94566-0802 Pleasanton,California 94566
<br /> United States United States
<br /> ��
<br /> Quantity Product - Product Description • ? , *, TotalaPrice
<br /> A Price
<br /> 1.00 Demolition Removal and haul away of existing play equipment and sandbox. $7,870.00 $7,870.00
<br /> Landscape Structures PlayBooster Design#104817-2-2 including Global Motion,Swing with
<br /> 2 Belt Seats&1 Toddler Seat,and Playstnicture including Double Swoosh Slide,
<br /> 1 00 PlayBooster, TurboTwister Tunnel Slide,Crest Climber,Deck Link,Loop Pole,Traveler Climber,Vertical $74,420.00 $74,420.00
<br /> 5-12 Ascent,Arch Bridge,Bubble Panel,Driver Panel,Pipe Barrier,Tic-Tac-Toe Panel,Chinning
<br /> Bar,Tuming Bar,Square Peak Tile Roofs,Curved Transfer Module and complimentary
<br /> Welcome Sign.
<br /> Installation of play equipment by a manufacturer certified installer.*Price does not include
<br /> temporary fencing or supply of any new wood fiber.Existing wood fiber will be disturbed
<br /> 1.00 Installation during construction,but we'll do our best to limit contamination.Additional fiber should be $22,326.00 $22,326.00
<br /> brought in and supplied by the Parks Dept.to top off the play area after play installation is
<br /> complete.
<br /> New arc shaped concrete curb to create small sandbox area(approximately 25 linear feet of
<br /> 1.00 Site Work new concrete).Sand from existing box will be moved to the new area.*No new sand is to be $4,535.00 $4,535.00
<br /> provided in this quote.
<br /> 1.00 Install-Site Removal and relocation of 3 existing benches.Benches are to be moved into the shady area $1,600.00 $1,600.00
<br /> Furnishings alongside the playground in the grass.
<br /> Total Quote Amounts
<br /> County/City Tax Alameda County Materials Amount $74,420.00
<br /> Tax Rate 9.2500% Tax Amount $6,883.85
<br /> Labor Total $36,331.00
<br /> Credit Terms Net 30 On Materials Shipment Freight Amount $4,851.00
<br /> Total $122,485.85
<br /> Notes to Customer
<br /> Thank you for the opportunity to quote your upcoming project.PLEASE NOTE:quote does not include installation,offload,
<br /> payment and performance bonds,engineering calculations,security,storage,permits,inspection,or safety surfacing
<br /> unless otherwise noted.
<br /> Deposits may be required before order can be placed depending on customer credit terms.Your purchase is subject to
<br /> the terms and conditions of this quote,approval of this quote agrees to those terms.
<br /> Signature
<br /> Name
<br /> Title
<br /> Prepared By Alex Hailey
<br /> Email alexh @rossrec.com
<br /> 100 Brush Creek Road,Suite 206,Santa Rosa,California 95404
<br /> p 707.538.3800•f 707.538.3826•rossrec.com•Contractors License#520752•DIR#1000003500•TaxID#68-0103540
<br />
|