My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
062017
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:04:18 PM
Creation date
6/14/2017 3:23:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/20/2017
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART B <br /> AN ESTIMATE OF THE COST OF THE MAINTENANCE <br /> 2017-2018 <br /> LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br /> NO. 1993-1 WINDSOR <br /> CITY OF PLEASANTON <br /> A. Landscaping (maintenance): <br /> 1. Tapestry Way Area A <br /> 2. Creekside Area B <br /> 3. Entry Creekside Area C <br /> $22,616.00 <br /> B. Water <br /> 1. All planting $6,000.00 <br /> C. Power <br /> 1. Two controllers $170.00 <br /> D. Reserve/Long-Term Replacement Fund for scheduled long-term <br /> replacement of various district improvements (see note) ($5,526.10) <br /> E. City of Pleasanton Administration Fee $600.00 <br /> SUBTOTAL $23,859.90 <br /> County Fees for Collection of Assessments $405.90 <br /> GRAND TOTAL $24,265.80 <br /> Assessment per Unit (90 units) $269.62 per year <br /> Note: <br /> An additional expense of $813 was required at the end of fiscal year 2015/16 for additional <br /> planting work requested by the homeowners. An additional $9,000 has been set aside for <br /> projected homeowner maintenance requests expected before the end of calendar year 2017. At <br /> the time of this report a fund balance of approximately $17,000 exists for Landscape <br /> Maintenance District 1993-1, Windsor. The projected expenses requiring use of the fund balance <br /> total $5,526. Reserve/replacement funds will be held in an interest bearing account until needed <br /> for future repairs or replacement of entry walls, signage, irrigation systems, landscaping or other <br /> District features. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.