My WebLink
|
Help
|
About
|
Sign Out
ORD 2162
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
6/13/2017 10:30:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
5/16/2017
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2162
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 15 and April 15 unless approved erosion control measures are in place, <br /> subject to the approval of the City Engineer. Such measures shall be maintained <br /> until such time as a permanent landscaping is in place. <br /> 103. The project developer.shall be responsible for the installation of the street lighting <br /> system serving the development. The street lights shall be LED units per City <br /> requirements and PG&E standard details, unless otherwise specifically approved. <br /> The lighting system design shall conform to the Illuminating Engineering Society <br /> (IES). Approval for the number, location, and type of electroliers shall be subject <br /> to the review and approval of the City Engineer. <br /> 104. The project developer shall submit detailed landscape and irrigation plans as part <br /> of the improvement plans. The irrigation plan shall provide for automatic controls. <br /> 105. All existing drainage swales that are filled shall have subdrains installed unless <br /> otherwise approved by the City Engineer and the developer's soils engineer. All <br /> subdrains shall have cleanouts installed at the beginning of the pipe. The end of <br /> the pipe shall terminate in a storm drain or other storm drain outfall, subject to the <br /> approval of the City Engineer. The applicant's engineer shall submit a final <br /> subdrain location map to the City Engineer prior to acceptance of the public <br /> improvements. It shall be the responsibility of the homeowner to relocate a <br /> subdrain, if during the excavation of a pool or other subsurface structure, a <br /> subdrain is encountered. All owners within the subdivision shall receive notice of <br /> the presence of these subdrains. The City Attorney shall approve said notice. <br /> 106. A detailed grading and drainage plan prepared by a licensed Civil Engineer <br /> including all supporting information and design criteria (including but not limited to <br /> any peer review comments), storm drain treatment calculations, hydromodification <br /> worksheets, etc., shall be submitted as part of the improvement plans. <br /> 107. The minimum grade for the gutter flowline shall be set at one percent where <br /> practical, but not less than 0.75% unless otherwise approved by the City Engineer. <br /> 108. A water meter shall be provided to each lot of record within the development. <br /> 109. A sanitary sewer lateral with two-way cleanout (located at the back of the sidewalk <br /> or curb, whichever is applicable) shall be provided to each lot of record within the <br /> development unless otherwise approved by the City Engineer. <br /> 110. The improvement plans for this development shall contain signage and striping <br /> plans that are subject to the approval of the City Traffic Engineer. <br /> 111. The curb and gutter along the street shall have a subdrain installed at either the <br /> back of the curb or lip of gutter at the discretion of the City Engineer. This detail <br /> P16-1384, P16-1386, P17-0155 & PUD-113, Ponderosa Homes II, INC. City Council <br /> Page 19 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.