My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
060617
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2017 11:49:03 AM
Creation date
5/31/2017 10:52:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/6/2017
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton"As Needed Services" <br /> Bid#OSD-17-02-ANCS <br /> PARKS <br /> LANDSCAPE SERVICES (IRRIGATION, PLANTING AND GENERAL CONSTRUCTION) <br /> COPE O SiERVII JES <br /> The City is requesting an experienced and licensed, (C-27 required) contractor to perform routine <br /> landscape construction,playground apparatus installation,and renovation work in the City parks and street <br /> median areas on an as-needed basis. All work is to be performed to current City Standards and <br /> Specifications dated November 2016.. Rates are to be on-site productive time only and are to include any <br /> clean up and disposal costs due to work. <br /> BID FORIVIC <br /> The cost quoted below shall include all taxes and all other charges, including travel expenses, and is the <br /> cost the City will pay for the term of any contract that is a result of this bid. <br /> Bidder hereby certifies to City that all representations, certifications, and statements made by Bidder, as <br /> set forth in this Bid Form and attachments are true and correct and are made under penalty of perjury <br /> pursuant to the laws of California. <br /> Contractor's Labor Rates (Hourly) <br /> Position Description Regular Time Overtime Emergency Callout <br /> Foreperson $ 55, 00 $ -}$,o C $ <br /> Operator $ SS , CAD $ TS:co $ <br /> Laborer/Pipe Layer $ 5 00 $ 5 00 $ <br /> 1 Truck Driver $ 5 S Dd $ 75.00 <br /> $ <br /> 1 Construction Laborer $ S S 0 0 $ t`.5, 06 $ <br /> Light Carpentry $ __ $ ,_ $ <br /> 11 Concrete Finisher $ $ $ _ <br /> J,f <br /> fir pn. -re c:-ln,n i c i c \ $ 65,UQ (B5,00 <br /> $ <br /> Parks <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.