My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
060617
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2017 11:49:03 AM
Creation date
5/31/2017 10:52:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/6/2017
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton"As Needed Services" <br /> Bid#OSD-17-02-ANCS <br /> PARKS <br /> TRAIL CONSTRUCTION SERVICES (Continued) <br /> Contractor's Equipment <br /> Equipment Size and Description Hourly Rate <br /> Excavator $ 200.00 <br /> Skid Steer Loader $225.00 <br /> Truck wl Hand Tools j4pui,k c Lald5C4/0-, lab $ 165.00 <br /> Wacker $ 162.00 <br /> Traffic Cones aeaAe ones30 $ 4.00 <br /> Dump Truck $ 125.00 <br /> Compressor w/Tools flat/ COMn( ors $ 125.00 <br /> Traffic Cones CXo 06nr-y $4.00 <br /> Misc. Tools lock Wank ner5 (S mks ta $ 65.00 <br /> Percent of mark-up on material: 15 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example:Material $1,000 + 10%($100)=$1,100. <br /> Percent of mark-up on outside equipment: 15 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000 + 10% ($200) = <br /> $2,200. <br /> Contractor Name: Signature: v ------ <br /> rnrd 59145 ---_ <br /> Parks <br /> Page 8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.