My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
060617
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2017 11:49:03 AM
Creation date
5/31/2017 10:52:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/6/2017
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton "As Needed Services" <br /> Bid#OSD-I 7-02-A NCS <br /> BUILDING MAINTENANCE <br /> STREET MEDIAN MULCH INSTALLATION <br /> SCOPE OF SERVICES <br /> Transport and Install City supplied wood chip mulch in existing street median landscapes. Wood mulch <br /> is available from the City Operations Center. Contractor will be responsible for loading, transporting <br /> and installing wood mulch to a depth of 5 inches. Contractor will also be responsible for traffic control <br /> and median work site clean-up on a daily basis. Scale of operation shall insure a minimum of 50 cubic <br /> yards per work day will be installed. Unit bid should take into account varying median size and design; <br /> and the resulting impact on installation costs and difficulty of installation. <br /> BID FORM <br /> The cost quoted below shall include all taxes and all other charges, including travel expenses. and is the <br /> cost the City will pay for the term of any contract that is a result of this bid. <br /> Bidder hereby certifies to City that all representations, certifications, and statements made by Bidder, as <br /> set forth in this Bid Form and attachments are true and correct and are made under penalty of perjury <br /> pursuant to the laws of California. <br /> Contractor's Rate <br /> Rate per <br /> Scope of Work Cubic Yard <br /> Load, transport and install a minimum of 50 Cubic Yards per day $ 90.00 <br /> Percent of mark-up on material: 15 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10%($100)= $1,100. <br /> Percent of mark-up on outside equipment: 15 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000 + 10% ($200) = <br /> $2,200. <br /> , c;�-�i tom) <•° �� `CG <br /> /-5 <br /> Contractor Name: Signature::. <br /> Parks <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.