Laserfiche WebLink
City of Pleasanton"As Needed Services" <br /> Bid#OSD-17-02-ANCS <br /> STREETS <br /> CONCRETE AND SOUND WALL REPAIR (Continued) <br /> BID FORM <br /> The cost quoted below shall include all taxes and all other charges, including travel expenses, and is the <br /> cost the City will pay for the term of any contract that is a result of this bid. <br /> Bidder hereby certifies to City that all representations, certifications, and statements made by Bidder, as <br /> set forth in this Bid Form and attachments are true and correct and are made under penalty of perjury <br /> pursuant to the laws of California. <br /> Unit of Measure <br /> Scope of Work (UOM) Rate <br /> Removal and replacement of sidewalk per square foot, including root Square foot $22 lib <br /> cutting or grinding if necessary, less than 160 sq. ft. <br /> Removal and replacement of sidewalk per square foot, including root Square foot iq.8 Y <br /> cutting or grinding if necessary, more than 160 sq. ft. <br /> Removal and replacement of curb and gutter per linear foot,to include Linear foot $( 50 <br /> root cutting or grinding if necessary, less than 40'. Z. <br /> Removal and replacement of curb and gutter per linear foot,to include Linear foot $52.50 <br /> root cutting or grinding if necessary, more than 40' <br /> Removal and replacement of driveway approach per square foot, to <br /> include root cutting or grinding if necessary, for one driveway 19'-23' Square foot $32.80 <br /> wide. <br /> Removal of existing concrete and installation of Case A handicap ramp Each $ <br /> for one ramp. 5 750..- <br /> Removal of existing concrete and installation of Case A handicap ramp Each $ o <br /> for 10 ramps <br /> Rebuilt/construct sections of damaged cinderblock sound wall,per City Square foot $55.°° <br /> specifications, at 100 sq. ft. per panel. <br /> Resetting of brick pavers per City specifications, 100 sq. ft. Square foot $ y6.°° <br /> Percent of mark-up on material: % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000+ 10%($100)=$1,100. <br /> Percent of mark-up on outside equipment: % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000 + 10% ($200) = <br /> $2,200. <br /> Contractor Name: Signature: I _ <br /> GEo2GE BLAwCHI <br /> CON5TgucTioiv INC. <br /> Streets <br /> Page 2 of <br />