The original design of the project was started by Kimley-Horn and Associates but was <br /> never completed due to the project engineer leaving the company. Kimley-Horn had <br /> successfully obtained the needed permits from Caltrans and Zone 7 for the work. Staff <br /> then tasked the "on-call" Pakpour Consulting Group to complete the design prior to the <br /> expiration of permits. Pakpour provided a proposal to complete the work for $92,000 <br /> assuming this could be accomplished. However finalizing the design took longer than <br /> expected as the work was coordinated with the regulatory agencies. Due to the delays, <br /> the original permits expired and required resubmittal of the permits. Pakpour is <br /> requesting an additional $16,350 to cover the cost for additional design services. Staff <br /> has reviewed their request and believes it to be justified. <br /> Due to the complex nature of the project, the City is also requesting construction <br /> support services by Pakpour Consulting Group to aide in the review of shop drawings, <br /> requests for information, record drawings, meetings and site visits as requested by the <br /> City. Construction support services will be billed on a time and material basis as needed <br /> for a not-to-exceed amount of $28,000. Staff recommends a task authorization to <br /> Pakpour Consulting Group for an additional $44,350 for the additional design and the <br /> construction support services. <br /> The Fish and Wildlife permit for the project requires a biological monitor be present <br /> when work occurs beneath the Arroyo de la Laguna, and to perform bird surveys prior to <br /> construction. The City is currently seeking new proposals for the biological monitoring <br /> services. Staff recommends budgeting $40,000 for the biological monitoring and bird <br /> survey services. This is a conservative estimate of the cost of the monitoring as it <br /> assumes something is found that needs mitigation in accordance with Fish and Wildlife <br /> permit. While staff does not anticipate mitigation will be required, the contract should <br /> allow for mitigation in the event it is necessary so that work may proceed expeditiously. <br /> The total anticipated expenditures for the project are $1,333,930, as outlined in <br /> Attachment 2. The original project budget for design and construction of the project was <br /> $600,000, allocated in the 2013/14 CIP. As the design progressed it was clear that this <br /> funding level was inadequate. An additional $200,000 was allocated for the project in <br /> the 2015/16 Capital Improvement Program. To fully fund the project now that bids have <br /> been opened and all costs identified, staff is recommending that an additional $533,930 <br /> be transferred from the Annual Sewer Main Replacement and Improvements project, <br /> CIP No. 16202. <br /> Page 3 of 4 <br />