My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
041817
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 10:23:59 AM
Creation date
4/11/2017 4:17:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-0 -_I_ 'ice iiil� <br /> Flo-Pak Integrated Municipal Pumping Systems <br /> Freight and Delivery Schedules <br /> Freight terms included in the proposal are FOB factory with full freight allowed to the job-site. The follow <br /> lead times are estimated based upon shop loads and conditions at the time of quotation. Lead times are <br /> subject to change. Failure to take delivery will prevent Patterson from honoring commitments to other <br /> customers, some of whom are subject to delivery damages. Therefore, Buyer must take delivery of <br /> equipment within 5 business days of equipment readiness for shipment. Storage, if necessary, including <br /> maintenance while in storage, is by Buyer at a non-Patterson facility. Patterson does not have storage <br /> capabilities. <br /> Item Approximate Lead Time <br /> Four to six weeks after receipt of an <br /> Submittals and shop drawings for approval acceptable purchase order or signed <br /> sales agreement. <br /> Fourteen to sixteen weeks after receipt <br /> Proposed equipment of approved submittals and notice to <br /> proceed with manufacturing. <br /> Pricing <br /> The following pricing is valid for 180 days from the date of this proposal. After 180 days, Patterson <br /> Pump Company reserves the right to review our pricing and modify as may be required to compensate <br /> for the rising cost of labor, materials and transportation. Pricing does not include sales tax. <br /> Total Price $368,542.00 <br /> Clarifications and Exceptions <br /> Patterson Pump Company makes the following clarifications and exceptions to the <br /> contract plans and specifications. <br /> Reference Description <br /> Patterson takes exception to providing a removable roof. The proposed <br /> Addendum#1, Page 7 building to too large for us to provide this option. We have included roof <br /> hatches for equipment removal in lieu of a removable roof. <br /> Addendum#1, Page 7 The proposed finish is called Stone Flake and resembles Stucco in texture. <br /> Color options are almost endless—whatever Sherwin Williams has to offer. <br /> Patterson takes exception to guaranteeing 60 dBA noise level 25 ft. from the <br /> Addendum#1, Page 7 equipment enclosure. The sound level inside the enclosure will be <br /> approximately 85 dBA and while we don't anticipate 60 dBA being a problem, <br /> we have no data that would allow us to guarantee this level. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.