Laserfiche WebLink
Procurement Contract No. 14812 <br /> SUPPLEMENTAL A <br /> The County of Alameda contracted with Pakpour Consulting Group to assess the <br /> Castlewood County Service Area's (CSA) existing water and sewer systems with a goal <br /> to identify existing and future deficiencies with the water and sewer system, develop <br /> capital improvement projects to mitigate the deficiencies, and identify funding <br /> mechanisms to asset in paying for the Capital Improvement Programs. <br /> The report was finalized in October 2012 and according to the report, overall the existing <br /> water system was assessed to be in good condition with the exemption of a few critical <br /> elements such as the Upper Level redwood tanks, storage capacity in the system, and the <br /> water main crossing underneath the Arroyo de Laguna. The water main crossing <br /> underneath the Arroyo de Laguna has been replaced to address that concern as well as a <br /> number of other minor issues listed in the report. The main issue required with the <br /> system is addressing the storage capacity and the replacement of the old deteriorating <br /> Upper Level Redwood Tanks in the system. <br /> The County contracted with Pakpour Consulting Group again to prepare an analysis of <br /> the storage required within the system, review alternative locations and options, provide <br /> cost estimates for various recommendations, and provide a final recommendation for <br /> replacement of the Upper Level Redwood Tanks. In July 2016 the report was finalized <br /> with a final recommendation for replacement of the two 100,000 gallon redwood tanks <br /> with dual 150,000 gallon steel or concrete tanks. Based on review with the County's <br /> operation & maintenance service provider, the City of Pleasanton's recommendation is <br /> that the County replace with 2 - 150,000 gallon steel tanks. <br /> Supplemental A <br /> Page 1 of 1 <br />