1 %-inch layer of hot mix asphalt (HMA) will be applied on top of the newly recycled <br /> pavement surface. <br /> A new Class II bike lane will be added to both Valley Avenue and Hopyard Road by <br /> performing minor roadway widening on the southbound direction of Hopyard Road, south <br /> of Black Avenue, and by modifying the striping configuration on Valley Avenue in order to <br /> support the City's "Complete Streets" Policy. All required Americans with Disabilities Act <br /> compliance curb ramps are being addressed under a separate project (Annual Curb & <br /> Gutter Replacements for Street Resurfacing, CIP No. 15509). <br /> Budget <br /> The estimated total expenditure for this project is $1,620,280 including a 10% <br /> construction contingency ($145,000). A summary of the project budget and estimated <br /> expenditures is presented in Attachment 3. <br /> Bids <br /> The project was advertised on February 20, 2017, February 25, 2017, and March 4, 2017. <br /> Sealed bids were opened on March 15, 2017, establishing the minimum three-week <br /> advertising period required by the funding program. There were four bids received, <br /> ranging from $1,450,536 from Granite Rock Company to $1,541,701.40 (see <br /> Attachment 1, Bid Summary). The low bid is approximately 4% lower than the engineer's <br /> estimate of $1,513,113. Past work performed by Granite Rock Company was verified to <br /> be satisfactory. Therefore, staff is recommending award of the construction contract to <br /> the lowest responsible bidder, Granite Rock Company. <br /> Schedule <br /> The proposed schedule for the project is as follows: <br /> Approval of Plans & Specifications and Award of Contract: 04/18/2017 <br /> Start of Construction: 05/15/2017 <br /> End of Construction: 07/21/2017 <br /> Submitted by: Fiscal Review: Approve by: <br /> Stephen ' atrick r Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Bid Summary <br /> 2. Funding and Estimated Expenditure Summary <br /> Page 3 of 3 <br />