My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
041817
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 2:23:59 PM
Creation date
4/11/2017 4:16:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRSTCARBON Proposal ti <br /> SOU. TIONS ` <br /> recommended aesthetic mitigation measures such as visual screening and increased setbacks will be <br /> included, if appropriate.The impact analysis will be supported by a set of computer-generated visual <br /> simulations from viewpoints selected in consultation with City staff. <br /> The proposed budget includes up to two review/revision cycles based on minor comments. <br /> Coordination <br /> Environmental Vision will coordinate with the project team and City staff to select simulation viewpoints <br /> and coordinate as needed to obtain and provide pertinent information in a timely fashion. <br /> Requested Data <br /> Digital drawings are requested in CAD and pdf format: <br /> o Existing site topography with property lines <br /> o Proposed grading for project site <br /> O Proposed site plan showing lot layout, roads etc. (digital and hardcopy format) <br /> O Aerial photograph of site and surrounding area <br /> O Tree survey showing existing trees and proposed tree removal <br /> o Floor plan and elevations drawings for proposed residential buildings <br /> O Information describing exterior colors and materials <br /> o Landscape plan <br /> Task 4: Administrative Draft EIR <br /> FCS will prepare an Administrative Draft EIR in accordance with the applicable requirements contained in <br /> CEQA Guidelines Sections 15120 through 15132.The Administrative Draft EIR will contain analysis <br /> supported by graphics and tables.The document will identify potentially significant impacts,feasible <br /> mitigation measures, and the residual significance after mitigation has been implemented.The contents <br /> of the Administrative Draft EIR will be as follows: <br /> Executive Summary <br /> In accordance with CEQA Guidelines Section 15123,the Executive Summary will contain a summary of <br /> the project, list the project alternatives, identify areas of controversy, and provide a matrix listing <br /> environmental impacts and mitigation measures, and the residual significance of all impacts. <br /> Introduction <br /> FCS will prepare the introduction including the purpose and background of the project,the <br /> determination of the lead agency,scope of the EIR, and the document's organization.The Introduction <br /> will establish the scope of review of the EIR and identify environmental topics that had been previously <br /> evaluated at a sufficient level in the prior rounds of environmental review and,thus,would not need to <br /> be re-evaluated. <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA 17 <br /> FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.