Laserfiche WebLink
EXHIBIT B <br /> THE CITY OF BUILDING PERMIT AND <br /> PLEASANTON DEVELOPMENT FEES <br /> www.pleasantonpermits.com PO Box 520, 200 Old Bemal Ave <br /> www.cityofpleasantonca.qov Pleasanton, CA 94566 (925)931-5300 <br /> January 1, 2017 <br /> Our Building Permit and Development Fees are shown here. The values shown in this document <br /> reflect the fee rates in effect at the time of publication and are subject to change without <br /> notification. The values shown in this document are for informational purposes only. Please <br /> contact the Building Division to verify all fee estimates before arriving and/or submitting an <br /> application. <br /> Plan Review Fees. Whenever a review of plans is required to verify compliance with any of the <br /> California Building Standard Codes, a Plan Review Fee is due at time of application submittal, see <br /> page 2. A Plan Review Fee is in addition to Permit Fees. The Plan Review Fee is either 75% of all <br /> Permit Fees and Surcharges, or 100% of Permit Fees and Surcharges when Life/Safety and <br /> Egress are also reviewed, with a minimum charge of$135. <br /> Building Permit Fees. Most non-structural repair and remodel permits for work on homes are now <br /> assessed a fixed fee that is not valuation based, see page 3. All other permit types will have the <br /> Permit Fee based the valuation or cost of the work being performed, see pages 4 and 5. You will <br /> always need to supply the valuation of a project for a permit, even for fees not based on valuation. <br /> Building Permit Fees are due and payable at the time of permit issuance. <br /> Typical projects with fixed fees include home kitchen remodels, bathroom remodels, reroofing, <br /> swimming pools, replacement of water heaters or furnaces, etc., and are usually not subject to <br /> Permit Surcharges. New Construction and Additions have their valuation based on square footage <br /> using our New Construction Valuation Table, see page 9. The valuation for most other repair, <br /> remodel and tenant improvement projects is based on the construction cost supplied by the <br /> applicant. <br /> Permit Surcharges. Additional Permit Surcharges are also assessed to Building Permits, but only <br /> as applicable, based on a percentage of the Building Permit Fee, see page 3. Surcharges are <br /> assessed whenever Sub-Trades (electrical, plumbing or mechanical work), Energy, Accessibility, <br /> Green Building and/or Stormwater treatment systems are required in the scope of work, or are <br /> being installed or altered on a Project in conjunction with the scope of work with a Building Permit. <br /> Projects that are required to have a Waste Management Plan (new buildings, additions, <br /> demolitions and remodels with valuation of $125k or more) will be assessed either a Waste <br /> Management Plan Fee or a Green Building Surcharge. A Technology Fee of 5% is assessed on all <br /> Permit Fees. <br /> Fire Sprinkler, Fire Alarm and Hazardous Materials Permits. These applications and plans are <br /> submitted at our Permit Center and routed to the Livermore Pleasanton Fire Department for <br /> review. See our separate Fire Permit Handouts for Fees. <br /> Development Fees. Development Fees are only applicable to newly constructed buildings and <br /> additions, or whenever a change of use within an existing building creates additional traffic and/or <br /> sewer impacts. Development Fees are assessed at the rate in effect and paid at the time of <br /> Building Permit Issuance, pages 5-8. <br /> a— _a <br />