Laserfiche WebLink
EXHIBIT B <br />THE CITY OF BUILDING PERMIT AND <br />PLEASANTON DEVELOPMENT FEES <br />www.pleasantonpermits.com PO Box 520, 200 Old Bernal Ave <br />www.citvofpleasantonca.00v Pleasanton, CA 94566 (925) 931 -5300 <br />January 1, 2017 <br />Our Building Permit and Development Fees are shown here. The values shown in this document <br />reflect the fee rates in effect at the time of publication and are subject to change without <br />notification. The values shown In this document are for informational purposes only. Please <br />contact the Building Division to verify all fee estimates before arriving and /or submitting an <br />application. <br />Plan Review Fees. Whenever a review of plans is required to verify compliance with any of the <br />California Building Standard Codes, a Plan Review Fee is due at time of application submittal, see <br />page 2. A Plan Review Fee is in addition to Permit Fees. The Plan Review Fee is either 75% of all <br />Permit Fees and Surcharges, or 100% of Permit Fees and Surcharges when Life /Safety and <br />Egress are also reviewed, with a minimum charge of $135. <br />Building Permit Fees. Most non - structural repair and remodel permits for work on homes are now <br />assessed a fixed fee that is not valuation based, see page 3. All other permit types will have the <br />Permit Fee based the valuation or cost of the work being performed, see pages 4 and 5. You will <br />always need to supply the valuation of a project for a permit, even for fees not based on valuation. <br />Building Permit Fees are due and payable at the time of permit issuance. <br />Typical projects with fixed fees include home kitchen remodels, bathroom remodels, reroofing, <br />swimming pools, replacement of water heaters or furnaces, etc., and are usually not subject to <br />Permit Surcharges. New Construction and Additions have their valuation based on square footage <br />using our New Construction Valuation Table, see page 9. The valuation for most other repair, <br />remodel and tenant improvement projects is based on the construction cost supplied by the <br />applicant. <br />Permit Surcharges. Additional Permit Surcharges are also assessed to Building Permits, but only <br />as applicable, based on a percentage of the Building Permit Fee, see page 3. Surcharges are <br />assessed whenever Sub - Trades (electrical, plumbing or mechanical work), Energy, Accessibility, <br />Green Building and /or Stormwater treatment systems are required in the scope of work, or are <br />being installed or altered on a Project in conjunction with the scope of work with a Building Permit. <br />Projects that are required to have a Waste Management Plan (new buildings, additions, <br />demolitions and remodels with valuation of $125k or more) will be assessed either a Waste <br />Management Plan Fee or a Green Building Surcharge. A Technology Fee of 5% is assessed on all <br />Permit Fees. <br />Fire Sprinkler, Fire Alarm and Hazardous Materials Permits. These applications and plans are <br />submitted at our Permit Center and routed to the Livermore Pleasanton Fire Department for <br />review. See our separate Fire Permit Handouts for Fees. <br />Development Fees. Development Fees are only applicable to newly constructed buildings and <br />additions, or whenever a change of use within an existing building creates additional traffic and /or <br />sewer impacts. Development Fees are assessed at the rate in effect and paid at the time of <br />Building Permit Issuance, pages 5 -8. <br />