Laserfiche WebLink
IbRMC <br />Project: City of Pleasanton, Happy Valley Water and Sewer Expansion Date. May 9, 2016 <br />Project Number: 0548 -002 <br />Component: Water System Expansion <br />Prepared by James Kohne, RMC <br />Estimate Type: Predesign, Class 4, AACE <br />Process Cost Summary <br />Spec. Division <br />Amount <br />Facilities <br />$ <br />2,280,000 <br />RAW CONSTRUCTION COST <br />$ <br />1,520,000 <br />Environmental, Legal, and Administrative (ELA) Allowance <br />10 % <br />$ <br />150,000 <br />Engineeringi Construction, Management (CM) Allowance <br />15% <br />$ <br />230,000 <br />BASE CONSTRUCTION COST <br />E <br />1,9 00,000 <br />Project Contingency <br />(Uncertainty in project facilities) <br />20% <br />$ <br />380,000 <br />FACILITIES FINAL COSTS $ <br />2,280,000 <br />Item <br />size <br />Units <br />Quantity Unit <br />Unit Cost <br />Total Cost <br />Facilities <br />$ <br />1,623,555 <br />Piping <br />8" PVC Pipe <br />8 <br />LF <br />_ <br />7640 <br />$ 18 <br />$ <br />138,164 <br />6" PVC Pipe <br />6 <br />LF <br />1100 <br />$ 13 <br />$ <br />14,733 <br />Joint Restraints (on 40% of 20' segments) <br />EA <br />175 <br />$ 198 <br />$ <br />34,618 <br />Fittings (1 per 100') <br />EA <br />87 <br />$ 1,000 <br />$ <br />87,400 <br />Installation <br />Hr /Fitting <br />87 <br />$ 100 <br />$ <br />8,740 <br />Sawcut 4" pavement (2x length of pipe) <br />LF <br />17480 <br />$ 4 <br />$ <br />71,216 <br />Excavation - Pipe trench, Vault Weir <br />CY <br />4230 <br />$ 5 <br />$ <br />21,956 <br />See table below for <br />Pipe Zone Embedment Fill ICY) (to V above <br />trenching <br />crown of pipe) <br />CY <br />2449 <br />$ 28 <br />$ <br />67,346 <br />dimensions. <br />Pipe Zone Compaction (CY) <br />CY <br />2449 <br />$ 3 <br />$ <br />7,483 <br />Volumes assume <br />Upper Trench Zone (BCY) (0.75' above pipe <br />BCY <br />1113 <br />$ 29 <br />E <br />32,060 <br />all 8" pipe <br />zone) <br />Upper Trench Compaction (BCY) <br />BCY <br />1113 <br />$ 1 <br />$ <br />1,591 <br />Shoring <br />LF <br />8740 <br />$ 10 <br />$ <br />87,400 <br />Hauling (Excess) (assumes all backfll is <br />CY <br />4230 <br />$ 5 <br />$ <br />22,484 <br />engineered) <br />Ag Base (BCY) (top 15" of trench) <br />BCY <br />1113 <br />$ 30 <br />$ <br />33,247 <br />Trench AC Plug Paving (trench width x pipe <br />SF <br />24039 <br />$ 3 <br />$ <br />64,120 <br />length) <br />Grind (SY) (surface area of streets not <br />SY <br />9468 <br />$ 3 <br />$ <br />28,284 <br />excavated) <br />AC Overlay (SF) (surface are of streets) <br />SF <br />109250 <br />$ 3 <br />$ <br />333,825 <br />Striping (length of piping) <br />LF <br />8740 <br />$ 1 <br />$ <br />10,724 <br />Hydrants <br />Hydrants <br />EA <br />21 <br />$ 3,283 <br />$ <br />68,950 <br />PRV Station <br />Pressure Reducing Valve <br />8" <br />EA <br />1 <br />S 12,264 <br />$ <br />12,264 <br />Gate Valves <br />8" <br />EA <br />2 <br />$ 3,101 <br />$ <br />6,202 <br />PRV Vault <br />4'x5'x5' <br />EA <br />1 <br />$ 3.751 <br />$ <br />3,751 <br />Butterfly Valves <br />Butterfly Valve <br />12" <br />EA <br />3 <br />$ 1.455 <br />$ <br />4,366 <br />Butterfly Valve <br />8" <br />EA <br />8 <br />$ 704 <br />$ <br />5,633 <br />Butterfly Valve <br />6" <br />EA <br />5 <br />$ 613 <br />$ <br />3,067 <br />Miscellaneous <br />Pot Hole (1 per 50') <br />EA <br />175 <br />$ 509 <br />$ <br />89,020 <br />Cathodic <br />LF <br />8740 <br />$ 9 <br />$ <br />81,898 <br />Traffic Control <br />LS <br />8740 <br />$ 5 <br />$ <br />44,510 <br />Subtotal: <br />$ <br />1,385,050 <br />Mobilization /Demobilization <br />%of subtotal <br />10% <br />$ <br />138,505 <br />Ptpe and Trenching Details 8" pipe <br />Avg cost per foot <br />$ <br />162 <br />Pipe Thickness <br />0.503 <br />in <br />Avg cost per foot 8" <br />$ <br />163 <br />OD Pipe <br />0.751 <br />ft <br />Avg cost per foot, 6" <br />$ <br />158 <br />Approx Pipe Cover <br />3 <br />ft <br />Trench Width <br />2.75 <br />It <br />Trench Depth <br />4.75 <br />ft <br />Lane Width <br />12.50 <br />ft <br />Note: Sales tax of 9.5% <br />is applied to appropriate material costs. <br />Page 1 of 1 <br />