Happy Valley Water & Sewer Study <br />Technical Memorandum <br />each parcel were applied to the upstream end of the nearest pipe. Based on the results of this modeling, the <br />existing sewers have sufficient capacity for flows under both Scenario I and Scenario 2. Hydraulic profiles <br />for all affected gravity pipelines have been included in Appendix C. Hydraulic profiles included in <br />Appendix C represent Scenario 2 flows; since no surcharge occurs under Scenario 2 flows, hydraulic <br />profiles under Scenario I were not included. Profiles A to F include proposed new sewers, and Profiles G <br />and H include only existing sewers that would convey flow from the Study Area. <br />The proposed pipelines have been organized into seven projects for cost estimating purposes, as identified <br />in Figure 6. <br />Puma Stations and Force Mains <br />Estimated flowrates and firm capacities for pump stations S -12 and S -14 are summarized in Table 5. The <br />sewersheds assumed for each force main are identified in Appendix C. <br />Pump station capacities were estimated based on pump curves provided by the City and a force main Hazen <br />Williams coefficient of 100. The existing force main attached to the S -14 pump station is 4 -inch diameter. <br />As the City requires a 6 -inch minimum diameter for force mains, it has been assumed that the 4 -inch <br />pipeline would be replaced with a 6 -inch force main. The capacity of the S -14 force main presented in <br />Table 5 is based on a 6 -inch diameter pipe. Pump and system curves for each pump station are included in <br />Appendix D. <br />As indicated in the Table, both pump stations have adequate capacity to handle the projected PW WF from <br />their respective tributary areas. <br />Table 5: Pump Station Capacity <br />Footnotes: <br />I. Assumes existing 4" force main is replaced with a new 6' force main. <br />November 2016 14 <br />