My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
022117
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:59:53 PM
Creation date
2/16/2017 12:03:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2017
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Happy Valley Water & Sewer Study <br />Technical Memorandum <br />Table 2: Implementation Allowances <br />1. Raw Construction Cost <br />Environmental, Legal, and <br />Administrative (ELA) Allowance <br />Engineering /Construction <br />Management (CM) Allowance <br />2. Raw Cost + Engineering + Implementation <br />Allowances <br />__ Project Contingency <br />3. Total Capital (Fully Loaded) Cost <br />3.2 Water System Evaluation Results <br />Raw Construction <br />10% <br />15% <br />1.25 x Raw Construction <br />1.5 x Raw Construction <br />Improvements required to extend water service are identified in Figure 4. All proposed pipeline segments <br />would have a maximum non -fire velocity and headless significantly below the 5 fps and 10 ft/1000 ft <br />required by the City, under both land use scenarios. Therefore, there is no difference in pipeline sizing <br />between Scenario 1 and Scenario 2. However, additional pipelines are required above those needed for <br />Scenario I to serve parcels that are not currently developed (Scenario 2). These pipelines have been <br />identified in Figure 4. Quantities of new hydrants and valves per segment of proposed pipe are also <br />identified in Figure 4. <br />Cost of the improvements are summarized in Table 3 and a more detail breakdown is included in Appendix <br />B. <br />Table 3: Water Improvements Cost Estimate Summary <br />1 Item • <br />8" 6,920 LF $1,128,000 <br />• <br />7,640 LF <br />$1,245,000 <br />Piping <br />6" <br />1,100 LF <br />$174,000 <br />1,100 LF <br />$174,000 <br />Hydrants <br />19 <br />$62,000 <br />21 <br />$69,000 <br />PRV Station <br />1 <br />$22,000 <br />1 <br />$22,000 <br />Butterfly Valves <br />15 <br />$12,000 <br />16 <br />$13,000 <br />Raw Construction <br />Subtotal' <br />$1,400,000 <br />$1,520,000 <br />Implementation Costs 25 %' <br />$350,000 <br />$380,000 <br />Capital Cost Subtotal <br />$1,750,000 <br />$1,900,000 <br />Project Contingency 20 %' <br />$350,000 <br />$380,000 <br />Capital Cost Total <br />$2.1 million <br />$2.28 million <br /># Units <br />92 <br />125 <br />Ca ital Cost Per Parcel <br />$22,000 <br />$18,000 <br />Rounded to the nearest 510,000 <br />November 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.