My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
011717
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2017 4:34:02 PM
Creation date
1/11/2017 11:04:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/17/2017
DESTRUCT DATE
15Y
DOCUMENT NO
03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® Alternative 1 Reducing the culvert length to 300 feet and adjusting the Master <br /> Plan design in the vicinity of the approximately 233 feet of un-culverted drainage <br /> swale accordingly <br /> ® Alternative 2 Avoiding major culverting completely by designing a bridge or small <br /> culvert between the proposed bandstand and great lawn, and a second <br /> pedestrian/cyclist bridge further north in Lions Wayside Park <br /> ® Alternative 3 Completely avoiding culverting by re-grading the steep banks <br /> adjacent to the drainage swale and great lawn to allow for use of the swale banks <br /> for concert/event seating and bandstand visibility <br /> Conceptual plans for these three alternatives would be evaluated by City staff, and the <br /> selected alternative would serve as the basis for modification of the previously submitted <br /> permitting package, preparation of supplemental environmental documentation and <br /> preparation of 30 percent engineering drawings (only for the selected alternative) A key <br /> objective in evaluating these alternatives would be to achieve minimal modification to the <br /> previously adopted Master Plan This objective would be balanced with the need to <br /> receive authorization from the permitting agencies for any work in or around the drainage <br /> swale before proceeding with buildout of the Master Plan The scope of work for this <br /> effort is presented in Attachment 1 Staff is requesting approval of this Third Amendment, <br /> which would increase the total Agreement by $39,911 from $144,510 to $184,421 <br /> Submitted by Fiscal Review Approved by <br /> il______\._ /(4/11"' ik <br /> Gerry Beaudin Tina Olson Nelson Fialho <br /> Director of Community Director of Finance City Manager <br /> Development <br /> Attachments <br /> 1 Third Amendment to Agreement between the City of Pleasanton and AECOM with <br /> Exhibit A, proposal from AECOM including amended scope of service and budget <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.