My WebLink
|
Help
|
About
|
Sign Out
ORD 2153
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
12/1/2016 1:39:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
11/15/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2153
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and Safety Official The registered design professional in responsible charge shall list the <br /> deferred submittals on the plans and shall submit the deferred submittal documents for <br /> review by the Building and Safety Official Submittal documents for deferred submittal <br /> items shall be submitted to the registered design professional in responsible charge who <br /> shall review them and forward them to the Building and Safety Official with a notation <br /> indicating that the deferred submittal documents have been reviewed and that they have <br /> been found to be in general conformance with the design of the building The deferred <br /> submittal items shall not be installed until their design and submittal documents have been <br /> approved by the Building and Safety Official <br /> 20.04.200 Information on Plans and Specifications. Plans and specifications shall be <br /> drawn to scale on substantial paper and shall be of sufficient clarity to indicate the location, <br /> nature and extent of the work proposed and show in detail that it will conform to the <br /> provisions of this code and all relevant laws, ordinances, rules and regulations <br /> Where conventional construction provisions are identified in Group R 3 occupancies, all <br /> braced wall lines shall be identified on the construction documents and all pertinent <br /> information including, but not limited to, bracing methods, location and length of braced wall <br /> panels, foundation requirements of braced wall panels at top and bottom shall be provided <br /> Plans for buildings of other than Group R 3 and Group U Occupancies shall indicate how <br /> required structural and fire resistive integrity will be maintained where penetrations will be <br /> made for electrical, mechanical, plumbing and communication conduits, pipes and similar <br /> systems <br /> 20.04.210 Time Limitation of Application. An application for a permit for any <br /> proposed work that did not require a plan review shall be deemed to have been abandoned <br /> 180 days after the date of filing, unless such application has been pursued in good faith or <br /> a permit has been issued, except that the Building and Safety Official is authorized to grant <br /> one or more extensions of time for an additional period not exceeding 180 days The <br /> extension shall be requested in writing and justifiable cause demonstrated An application <br /> shall not be extended if this code or any other pertinent laws or ordinances have been <br /> amended subsequent to the date of application <br /> 20.04.220 Expiration of Plan Review. An application for a permit for any proposed <br /> work under review shall be deemed to have been abandoned 360 days after the date of <br /> filing, unless such application has been pursued in good faith or a permit has been issued, <br /> except that the Building and Safety Official is authorized to grant one extension of time for <br /> an additional period not exceeding 180 days The extension shall be requested in writing <br /> and justifiable cause demonstrated An application shall not be extended if this code or any <br /> other pertinent laws or ordinances have been amended subsequent to the date of <br /> application In order to renew action on an application after expiration, the applicant shall <br /> resubmit plans and pay a new plan review fee <br /> 20.04.230 Design professional in responsible charge. When it is required that <br /> documents be prepared by an architect or engineer, the Building and Safety Official shall <br /> be authorized to require the owner to engage and designate on the building permit <br /> application a registered design professional who shall act as the registered design <br /> professional in responsible charge If the circumstances require, the owner may designate <br /> a substitute registered design professional in responsible charge who shall perform all the <br />
The URL can be used to link to this page
Your browser does not support the video tag.