Laserfiche WebLink
Field Resident Engineer During Construction <br /> CM, Inc shall provide a Resident Engineer to support the City's Construction Manager <br /> and to directly coordinate with the City Design team The Resident Engineer will be the <br /> daily point of contact with the Contractor and will report directly to the City's Construction <br /> Manager The Field Engineer may perform some or all of the following <br /> • Set agenda (with Construction Manager) and attend weekly construction <br /> meetings, prepare meeting minutes/notes, and publish within 48 hours <br /> • Use options contained in Contract Plans to develop pipeline honzontal and <br /> vertical alignment as needed to avoid minor obstructions in the alignment Use <br /> bid item costs and schedule of value costs, to the extent possible, to establish <br /> cost of 'work around' adjustments <br /> • Identify needed major alignment changes (that cannot be resolved during daily <br /> construction), and coordinating a solution with the Construction Manager, <br /> Contractor, and City staff <br /> • Coordinate with City, Zone 7 Water Agency, California Department of Fish and <br /> Wildlife, and Dublin San Ramon Services District <br /> • Proactively schedule and conduct meetings with design team, City staff, and/or <br /> construction manager, as needed to <br /> o Minimize of impacts to residences, places of business, traffic (including <br /> the decision to use night construction in select areas) <br /> o Assist testing and flushing of pipelines to allow progressive delivery of <br /> water service <br /> • Develop, review, and coordinate with Construction Manager, documentation for <br /> Change Orders (final review and approval by Construction Manager and City) <br /> • Review of shop drawing submittals for completeness and transmit submission to <br /> designer <br /> • Review of shop drawings (non-technical) <br /> • Issue Contract Day Statements <br /> • Review and track certified payrolls and aid in interview <br /> • Review traffic control plans and provide comments to Traffic Department for their <br /> approval <br /> • Coordinate with City's biologist for Mitigation Monitoring and Reporting <br /> • Review contractor's compliance with CEQA requirements <br /> • Monitor status of construction, construction schedule, status/flow of submittals, <br /> RFIs, PCOs, and other paper work flow/documentation, including <br /> o Shop drawing field log <br /> o RFI field log <br /> o PCO field log <br /> o Change Order field log <br /> o Progress payment processing/progress verification <br /> o On a weekly basis, compile, summarize, return for correction Of needed), <br /> inspectors' daily reports <br /> o Maintaining updated (weekly basis) set of construction documents <br /> incorporating RFIs, COs, as-built information <br /> • Scheduling and coordination of specialty inspections and testing (geotechnical, <br /> material testing) <br /> • Coordination with City staff related to design activities and deadlines <br />