Laserfiche WebLink
118 All buildings undergoing construction, alteration or demolition shall comply with the <br /> California Fire Code currently in effect pertaining to the use of any hazardous materials, <br /> flame-producing devices, asphalt/tar kettles, etc <br /> URBAN STORMWATER CONDITIONS <br /> 119 The project shall comply with the NPDES Permit No CAS612008, dated November 19, <br /> 2015, and amendments, issued the by California Regional Water Quality Control Board, <br /> San Francisco Bay Region, a copy of which is available at the Community Development <br /> Department, Public Works/Engineering section at City offices, Alameda County Clean <br /> Water Program, State Water Board, and at the following websites <br /> http //www waterboards ca gov/sanfranciscobav/water issues/programs/stormwater/Muni <br /> cipal/index shtml, <br /> and <br /> http //www waterboards ca gov/sanfranciscobav/board info/agendas/2007/march/alamed <br /> a%20final%20order%20r2-2007-0025 pdf <br /> The project shall comply with the "Construction General Permit" as required by the San <br /> Francisco Bay Regional Water Quality Control Board <br /> (http //www waterboards ca gov/water_issues/programs/stormwater/construction shtml) <br /> A Design Requirements <br /> 1 The NPDES Permit design requirements include, but are not limited to, the following <br /> a Source control, sight design measures, and design and implementation of <br /> stormwater treatment measures are required when commercial, industrial or <br /> residential development creates and replaces 10,000 square feet or more of <br /> impervious surface, including roof area, streets and sidewalk <br /> b Hydro-modification standards are required when a new development or <br /> redevelopment project creates and replaces total impervious area of one acre or <br /> more <br /> c The NPDES Permit requires a proactive Diazinon pollutant reduction plan (aka <br /> Pesticide Plan) to reduce or substitute pesticide use with less toxic alternatives <br /> d The NPDES Permit requires complying with the Copper Pollutant Reduction Plan <br /> and the Mercury Pollutant Reduction Plan <br /> 2 The following requirements shall be incorporated into the project <br /> a The project developer shall submit a final grading and drainage plan prepared by <br /> a licensed civil engineer depicting all final grades and on-site drainage control <br /> measures including bio-swales Irrigated bio-swales shall be redesigned as <br /> Case No PUD-114, 11300 Dublin Canyon City Council <br /> Page 21 of 26 <br />