Laserfiche WebLink
73 A construction trailer shall be allowed to be placed on the project site for daily <br /> administration/coordination purposes during the construction period <br /> 74 Portable toilets used during construction shall be kept as far as possible from existing <br /> residences and shall be emptied on a regular basis as necessary to prevent odor <br /> 75 The developer and future homeowners are encouraged to use reclaimed gray water, rain <br /> water, etc , for landscape irrigation If used, the details shall be shown on the permit plan <br /> set to the satisfaction of the Director of Community Development before issuance of a <br /> building permit <br /> Landscaping <br /> 76 Six-inch vertical concrete curbs shall be installed between all vehicular paved and <br /> landscaped areas <br /> 77 The project developer shall provide root control barriers and four inch perforated pipes for <br /> parking lot trees, street trees, and trees in planting areas less than ten feet in width, as <br /> determined necessary by the Director of Community Development at the time of review of <br /> the final landscape plans <br /> 78 The following statements shall be printed on the site, grading, and landscape plans where <br /> applicable to the satisfaction of the Director of Community Development prior to issuance <br /> of a building permit <br /> a No existing tree may be trimmed or pruned without prior approval by the Director of <br /> Community Development <br /> b No equipment may be stored within or beneath the driplines of the existing trees to <br /> be saved <br /> c No oil, gasoline, chemicals, or other harmful materials shall be deposited or disposed <br /> within the dnpline of the trees or in drainage channels, swales, or areas that may <br /> lead to the dnpline <br /> d No stockpiling/storage of fill, etc , shall take place underneath or within five feet of <br /> the dnpline of the existing trees <br /> Building and Safety Division <br /> 79 At the time of building permit plan submittal, the project developer shall submit a final <br /> grading and drainage plan prepared by a licensed civil engineer depicting all final grades <br /> and on-site drainage control measures to prevent stormwater runoff onto adjoining <br /> properties <br /> 80 Prior to issuance of building permits, the applicant/developer shall submit a waste <br /> management plan to the Building and Safety Division The plan shall include the estimated <br /> Case No PUD-114, 11300 Dublin Canyon City Council <br /> Page 15 of 26 <br />