My WebLink
|
Help
|
About
|
Sign Out
ORD 2151
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
10/11/2016 2:36:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2151
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g All projects using architectural copper roofing, gutters, downspouts, etc , <br /> shall utilize the following Best Management Practices for use and <br /> maintenance <br /> i During installation, copper material shall be pre-patinated at the <br /> factory If patination is done on-site, collect the rinse water in a tank <br /> and haul off-site for disposal With prior authorization from Dublin <br /> San Ramon Services District (DSRSD), you may collect the rinse <br /> water in a tank and discharge to the sanitary sewer Optionally, <br /> consider coating the copper materials with a clear coating that <br /> prevents further corrosion and stormwater pollution The clear <br /> coating, if utilized, shall be reapplied (as recommended by the <br /> coating manufacturer) to maintain its efficacy <br /> ii During maintenance, the following applies during washing and <br /> patination <br /> 1 Minimize washing of architectural copper as it damages the <br /> patina and any protective coating <br /> 2 Block all storm drain inlets downstream of the wash <br /> 3 Collect in a tank and dispose off-site, or discharge the wash water <br /> to the sanitary sewer (with prior authorization from DSRSD) <br /> h During re-patination, collect the rinse water in a tank and dispose off-site or <br /> discharge to sewer (with prior authorization from DSRSD) <br /> i Roof drains shall drain away from the building foundation Stormwater flow <br /> shall drain to a landscaped area or to an unpaved area wherever practicable <br /> as determined by the City Engineer/Chief Building Official <br /> Construction Requirements <br /> 140 The project shall comply with the "Construction General Permit" requirements of <br /> the NPDES Permit for construction activities (including other land disturbing <br /> activities) that disturb one acre or more (including smaller sites that are part of a <br /> larger common plan of development) <br /> Information related to the Construction General Permit is on line at <br /> to http //www waterboards ca qov/water issues/programs/stormwater/constr <br /> uction html <br /> to http //www waterboards ca qov/water issues/programs/stormwater/docs/fi <br /> nalconstpermit pdf <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 26 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.