My WebLink
|
Help
|
About
|
Sign Out
ORD 2151
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
10/11/2016 2:36:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2151
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b All underground fire protection work shall require a California contractor's <br /> license type as follows C-16, C-34, C-36 or A <br /> c All field-testing and inspection of piping joints shall be conducted prior to <br /> covering of any pipeline <br /> 132 Dead-end fire service water mains shall not exceed 500 feet in length and/or have <br /> more than five Fire Department appliances* shall be looped around the site or <br /> building and have a minimum of two points of water supply or street connection <br /> Zone valves shall be installed as recommended under NFPA, Pamphlet 24 and <br /> the Fire Marshal <br /> *Note Fire Department appliances are classified as fire sprinkler system risers, <br /> fire hydrants and/or standpipes <br /> 133 Portable fire extinguisher(s) shall be provided and installed in accordance with the <br /> California Fire Code currently in effect and Fire Code Standard #10-1 Minimum <br /> approved size for all portable fire extinguishers shall be 2A 10B C <br /> 134 All buildings undergoing construction, alteration or demolition shall comply with <br /> Chapter 14 (California Fire Code currently in effect) pertaining to the use of any <br /> hazardous materials, flame- producing devices, asphalt/tar kettles, etc <br /> 135 The building (s) covered by this approval shall conform to the requirements of the <br /> California Building Code currently in effect, the California Fire Code currently in <br /> effect and the City of Pleasanton Ordinance 2015 If required plans and <br /> specifications for the automatic fire sprinkler system shall be submitted to the <br /> Livermore-Pleasanton Fire Department for review and approval prior to <br /> installation The fire alarm system, including water flow and valve tamper, shall <br /> have plans and specifications submitted to Fire Prevention for review and approval <br /> prior to installation All required inspections and witnessing of tests shall be <br /> completed prior to final inspection and occupancy of the building(s) <br /> URBAN STORMWATER CONDITIONS <br /> 136 The project developer shall include erosion control measures, prepared and signed <br /> by the Qualified Storm Water Pollution Prevention Plan Developer (QSD), on the <br /> final grading plan, subject to the review of the City Engineer These erosion control <br /> measures shall be as required by the state's Construction General Permit The <br /> project developer is responsible for ensuring that the contractor is aware of such <br /> measures All cut and fill slopes shall be revegetated and stabilized as soon as <br /> possible after completion of grading, in no case later than October 15 No grading <br /> shall occur between October 15 and April 15 unless approved erosion control <br /> measures are in place, subject to the approval of the project QSD and the City <br /> Engineer Such measures shall be maintained until such time as a permanent <br /> landscaping is in place, site is stabilized and Notice of Completion (NOC) has been <br /> filed with the State Regional Water Board and/or accepted by City <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 23 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.