My WebLink
|
Help
|
About
|
Sign Out
ORD 2151
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
10/11/2016 2:36:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2151
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b No equipment may be stored within or beneath the driplines of the existing <br /> trees <br /> c No oil, gasoline, chemicals, or other harmful materials shall be deposited or <br /> disposed within the dnpline of the trees or in drainage channels, swales, or <br /> areas that may lead to the dnpline <br /> d No stockpiling/storage of fill, etc , shall take place underneath or within five <br /> feet of the dnpline of the existing trees <br /> Construction <br /> 83 Campers, trailers, motor homes, or any other similar vehicle are not allowed on the <br /> construction site except when needed as sleeping quarters for a security guard <br /> 84 A construction trailer shall be allowed to be placed on the project site for daily <br /> administration/coordination purposes during the construction period <br /> 85 Portable toilets used during construction shall be kept as far as possible from <br /> existing residences and shall be emptied on a regular basis as necessary to <br /> prevent odor <br /> Building and Safety Division <br /> 86 At the time of building permit plan submittal, the project developer shall submit a <br /> final grading and drainage plan prepared by a licensed civil engineer depicting all <br /> final grades and on-site drainage control measures to prevent stormwater runoff <br /> onto adjoining properties <br /> 87 Prior to issuance of building permits, the applicant shall submit a waste <br /> management plan to the Building and Safety Division The plan shall include the <br /> estimated composition and quantities of waste to be generated and how the project <br /> developer intends to recycle at least 75 percent of the total job site construction <br /> waste measured by weight or volume Proof of compliance shall be provided to <br /> the Chief Building Official prior to the issuance of a final building permit During <br /> construction, the project developer shall mark all trash disposal bins "trash <br /> materials only" and all recycling bins "recycling materials only " The project <br /> developer shall contact Pleasanton Garbage Service for the disposal of all waste <br /> from the site <br /> Engineering Department <br /> 88 The project developer/owner shall grant an easement to the City over those <br /> parcels needed for public service easements (P S E ) and which are approved by <br /> the City Engineer, or other easements, which may be designated by the City <br /> Engineer <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 16 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.