My WebLink
|
Help
|
About
|
Sign Out
ORD 2151
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
10/11/2016 2:36:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2151
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49 The applicant shall reconstruct any non-ADA-compliant and/or uplifted and <br /> deficient sidewalk and curb and gutter along the project frontage identified prior to <br /> the issuance of the first construction permit by the Building and Safety Division <br /> 50 The City Engineer shall determine if the applicant shall be required to construct a <br /> public sanitary sewer main within Parcel "A " <br /> 51 The applicant shall abandon all unused existing utility stubs in compliance with City <br /> standards and specifications <br /> 52 The applicant shall be responsible for the undergrounding of the overhead utility <br /> lines across the project frontage on St John Street The undergrounding shall be <br /> completed prior to the first final inspection by the Building and Safety Division for <br /> any of the lots All utility lines shall be installed in conduit Only PG&E switch <br /> enclosures or capacity banks can be installed above ground provided the units are <br /> screened with landscaping to the satisfaction of the Director of Community <br /> Development <br /> 53 The applicant shall install slurry seal on St John Street from lip of gutter to street <br /> centerline, after completion of utility undergrounding and frontage improvements, <br /> prior to the acceptance of improvements <br /> 54 All landscaping within the public right-of-way along the project's frontage shall be <br /> maintained by the homeowners/maintenance association unless otherwise <br /> approved by the City Engineer Necessary irrigation system, irrigation water <br /> meter, irrigation valves, irrigation controller, etc shall been included on the final <br /> map plan <br /> 55 The parcel of the relocated existing house shall be part of a drainage management <br /> area The drainage management area shall be shown on the building permit <br /> grading plans submitted to the Building and Safety Division for plan check and <br /> permit issuance and shall be subject to the review and approval of the City <br /> Engineer prior to issuance of building permits <br /> 56 The applicant shall submit Engineering Services sanitary sewer demand, water <br /> demand, and hydraulic and hydrologic calculations with the Improvement Plans <br /> stamped and signed by a California Registered Civil Engineer <br /> 57 All required faithful performance bonds and labor materials bonds (security bonds) <br /> in a penal amount equal to 100 percent of the approved estimates of construction <br /> costs of improvements shall be submitted to and approved by the City prior to <br /> approval of the Final Map or issuance of the Building or Grading Permit, whichever <br /> comes first <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 11 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.