My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
100416
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:27:44 PM
Creation date
9/29/2016 2:39:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
15Y
DOCUMENT NO
17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Order #005: Tri-Valley Potable Reuse Feasibility Study <br /> Background <br /> The Water Supply Evaluation Update (WSE Update) completed by Zone 7 Water Agency <br /> (Zone 7) in February 2016 underscored the need to pursue water supply options to <br /> enhance long-term water supply reliability for the Livermore-Amador Valley. Potential <br /> future water supply options identified in the WSE Update include the California WaterFix, <br /> desalination,and potable reuse. For potable reuse, a high-level review (HDR, 2016) <br /> considered various options including groundwater injection,recharge in the Chain of Lakes <br /> (COLs), surface water augmentation (COLs, Lake Del Valle, and Patterson Reservoir),and <br /> direct connection to the water transmission system. <br /> On February 11, 2016, elected representatives at the Joint Liaison Committee <br /> Meeting/Water Policy Roundtable—which included elected representatives from the cities <br /> of Dublin, Livermore, Pleasanton, San Ramon, Dublin San Ramon Services District (DSRSD), <br /> and Zone 7—discussed and supported a more detailed study of potable reuse. <br /> Overview of Task Order <br /> The primary goals of the Potable Reuse Feasibility Study are to evaluate the feasibility of <br /> potable reuse for the Valley; to identify the most promising options based on technical, <br /> financial,and regulatory considerations; and,assuming that potable reuse is found to be <br /> feasible,to recommend next steps for the agencies.The options to be further evaluated <br /> include groundwater recharge/injection, surface water augmentation,and connection <br /> upstream of the Zone 7 WTPs; direct connection to the water transmission system is not <br /> being considered at this time based on input from the elected representatives at the <br /> February 2016 meeting.The findings and recommendations from the study will be <br /> presented to the governing bodies of the Tri-Valley water agencies for their consideration <br /> and potential actions.The feasibility study will be coordinated closely with parallel efforts <br /> on public outreach and an evaluation of the relevant institutional matters. <br /> This Task Order covers the cost of the consulting services to be shared among the partners. <br /> Through a Request for Proposal process, Carollo Engineers (Consultant)was selected by <br /> the partners as most qualified to perform the feasibility study.The total budget of the <br /> consulting services for the study is $755, 000.With a contingency of$95,000 (13%),the <br /> not-to-exceed amount for the study is $850,000.The scope of work,work plan summary, <br /> and detailed budget for the consulting services are included in Attachment A. <br /> Partner Responsibilities <br /> Zone 7 and the retailers have formed a Steering Committee with representatives from all <br /> the agencies to oversee policy issues related to the study. Similarly,a Project Management <br /> Committee consisting of technical staff has been formed to oversee the technical work,with <br /> a designated project manager from Zone 7. Zone 7 was also selected to serve as the Lead <br /> Agency or contract administrator for consulting services.There will be separate efforts to <br />
The URL can be used to link to this page
Your browser does not support the video tag.