Laserfiche WebLink
a. The Construction General Permit's requirements include, but are not <br /> limited to, the following: <br /> i. The project developer shall obtain a construction general permit <br /> (NOI) from the Regional Water Quality Control Board to discharge <br /> stormwater, and to develop and implement stormwater pollution <br /> prevention plans. <br /> ii. The project developer shall submit a Stormwater Pollution <br /> Prevention Plan (SWPPP) to the City Engineer/Chief Building <br /> Official for review and approval prior to the issuance of a grading or <br /> building permit, whichever is sooner. A copy of the approved <br /> SWPPP, including all approved amendments, shall be available at <br /> the project site for City review until all engineering and building <br /> work is complete and City permits have been finaled. A site <br /> specific SWPPP must be combined with proper and timely <br /> installation of the BMPs, thorough and frequent inspections, <br /> maintenance, and documentations. SWPPP for projects shall be <br /> kept up to date with the projects' progress. Failure to comply with <br /> the most updated construction SWPPP may result in the issuance <br /> of correction notices, citations, and/or stop work orders. <br /> iii. The project developer is responsible for implementing the following <br /> Best Management Practices (BMPs). These, as well as any other <br /> applicable measures, shall be included in the SWPPP and <br /> implemented as approved by City. <br /> 1. The project developer shall include erosion control/stormwater <br /> quality measures on the project grading plan which shall <br /> specifically address measures to prevent soil, dirt, and debris <br /> from entering the public storm drain system. Such measures may <br /> include, but are not limited to, hydroseeding, hay bales, <br /> sandbags, and siltation fences and shall be subject to the review <br /> and approval of the City Engineer/Chief Building Official. If no <br /> grading plan is required, necessary erosion control/stormwater <br /> quality measures shall be shown on the site plan submitted for a <br /> building permit, and shall be subject to the review and approval <br /> of the Building and Safety Division. The project developer is <br /> responsible for ensuring that the contractor is aware of and <br /> implements such measures. <br /> 2. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading, but in no case later than October 15. <br /> Hydroseeding shall be accomplished before September 15 and <br /> irrigated with a temporary irrigation system to ensure that the <br /> vegetated areas are established before October 15. No grading <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 27 of 30 <br />