Laserfiche WebLink
b. All underground fire protection work shall require a California contractor's <br /> license type as follows: C-16, C-34, C-36 or A. <br /> c. All field-testing and inspection of piping joints shall be conducted prior to <br /> covering of any pipeline. <br /> 132. Dead-end fire service water mains shall not exceed 500 feet in length and/or have <br /> more than five Fire Department appliances* shall be looped around the site or <br /> building and have a minimum of two points of water supply or street connection. <br /> Zone valves shall be installed as recommended under NFPA, Pamphlet 24 and <br /> the Fire Marshal. <br /> *Note: Fire Department appliances are classified as fire sprinkler system risers, <br /> fire hydrants and/or standpipes. <br /> 133. Portable fire extinguisher(s) shall be provided and installed in accordance with the <br /> California Fire Code currently in effect and Fire Code Standard #10-1. Minimum <br /> approved size for all portable fire extinguishers shall be 2A 10B:C. <br /> 134. All buildings undergoing construction, alteration or demolition shall comply with <br /> Chapter 14 (California Fire Code currently in effect) pertaining to the use of any <br /> hazardous materials, flame- producing devices, asphalt/tar kettles, etc. <br /> 135. The building (s) covered by this approval shall conform to the requirements of the <br /> California Building Code currently in effect, the California Fire Code currently in <br /> effect and the City of Pleasanton Ordinance 2015. If required plans and <br /> specifications for the automatic fire sprinkler system shall be submitted to the <br /> Livermore-Pleasanton Fire Department for review and approval prior to <br /> installation. The fire alarm system, including water flow and valve tamper, shall <br /> have plans and specifications submitted to Fire Prevention for review and approval <br /> prior to installation. All required inspections and witnessing of tests shall be <br /> completed prior to final inspection and occupancy of the building(s). <br /> URBAN STORMWATER CONDITIONS <br /> 136. The project developer shall include erosion control measures, prepared and signed <br /> by the Qualified Storm Water Pollution Prevention Plan Developer (QSD), on the <br /> final grading plan, subject to the review of the City Engineer. These erosion control <br /> measures shall be as required by the state's Construction General Permit. The <br /> project developer is responsible for ensuring that the contractor is aware of such <br /> measures. All cut and fill slopes shall be revegetated and stabilized as soon as <br /> possible after completion of grading, in no case later than October 15. No grading <br /> shall occur between October 15 and April 15 unless approved erosion control <br /> measures are in place, subject to the approval of the project QSD and the City <br /> Engineer. Such measures shall be maintained until such time as a permanent <br /> landscaping is in place, site is stabilized and Notice of Completion (NOC) has been <br /> filed with the State Regional Water Board and/or accepted by City. <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 23 of 30 <br />