My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
100416
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:42:56 PM
Creation date
9/29/2016 2:08:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
106. The curb and gutter along the street shall have a subdrain installed at either the <br /> back of the curb or lip of gutter at the discretion of the City Engineer. This detail <br /> shall be shown on the improvement plans. Said drains shall be connected to the <br /> storm drain system or drained by other means acceptable to the City Engineer. <br /> 107. All existing septic tanks or holding tanks, if any, shall be properly abandoned <br /> pursuant to the requirements of the Alameda County Department of Health <br /> Services prior to the start of grading operations, unless specifically approved by <br /> the City Engineer. <br /> 108. The project developer shall submit detailed landscape and irrigation plans as part <br /> of the improvement plans. The irrigation plan shall provide for automatic controls. <br /> 109. The applicant shall post with the City, prior to approval of the subdivision map, a <br /> separate performance bond for the full value of all improvements that are not to be <br /> accepted by the City of Pleasanton. <br /> 110. All retaining walls along the street shall be placed behind the Public Service <br /> Easement (PSE), unless otherwise approved by the City Engineer. <br /> Livermore-Pleasanton Fire Department <br /> 111. The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> 112. Prior to any construction framing, the project developer shall provide adequate fire <br /> protection facilities, including, but not limited to a water supply and water flow in <br /> conformance to the City's Fire Department Standards able to suppress a major <br /> fire. <br /> 113. The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site <br /> fire mains and fire hydrant locations only. Plan check comments and approvals DO <br /> NOT INCLUDE: <br /> a. Installation of the on-site fire mains and fire hydrants. Specific installation <br /> drawings submitted by the licensed underground fire protection contractor shall <br /> be submitted to the Fire Prevention Bureau for approval. <br /> b. Backflow prevention or connections to the public water mains. <br /> 114. Electrical conduit shall be provided to each fire protection system control valve <br /> including all valve(s) at the water connections. The Livermore-Pleasanton Fire <br /> Department requires electronic supervision of all valves for automatic sprinkler <br /> systems and fire protection systems. <br /> 115. Address numbers shall be installed on the front or primary entrance for all <br /> buildings. Minimum building address character size shall be 12" high by 1" stroke. <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 19 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.