89. This approval does not guarantee the availability of sufficient sewer capacity to <br /> serve the project. <br /> 90. There shall be no direct roof leaders connected to the street gutter or storm drain <br /> system, unless otherwise approved by the City Engineer. <br /> 91. Each lot shall have an independent water lateral connection to the public water <br /> main per Municipal Code Section 14.04.050.C. <br /> 92. Each lot shall have an independent sanitary sewer service lateral connection to <br /> the public sanitary sewer main per Municipal Code Section 15.32.090.A. <br /> 93. The minimum grade for the gutter flowline shall be set at one percent where <br /> practical, but not less than .75% unless otherwise approved by the City Engineer. <br /> 94. A detailed grading and drainage plan prepared by a licensed Civil Engineer <br /> including all supporting information and design criteria (including but not limited to <br /> any peer review comments), storm drain treatment calculations, etc., shall be <br /> submitted as part of the improvement plans. <br /> 95. The applicant's engineer shall investigate the structural section of the existing <br /> streets fronting the development. If the structural section is not adequate for the <br /> anticipated traffic demand, the structural section of the roadway shall be increased, <br /> as determined by the City Engineer. If the street section is adequate the entire <br /> street frontage shall be slurry sealed, unless otherwise determined by the City <br /> Engineer. <br /> 96. All landscaping within public right-of-way along the project's frontage shall be <br /> maintained by the homeowners association unless otherwise approved by the City <br /> Engineer and necessary irrigation system, irrigation water meter, irrigation valves, <br /> irrigation controller, etc. have been included on the plan for maintenance of all <br /> landscaping within public right-of-way. <br /> 97. The project developer shall comply with the recommendations of the project's <br /> geotechnical consultant. The project developer's geotechnical consultant shall <br /> review and approve all foundation, retaining wall, and drainage geotechnical <br /> aspects of the final development plans to ensure that the recommendations have <br /> been properly incorporated into the development. The consultant shall certify by <br /> writing on the plans, or as otherwise acceptable to the City Engineer, that the final <br /> development plan is in conformance with the geotechnical report approved with <br /> the project. <br /> 98. The project developer shall arrange and pay for the geotechnical consultant to <br /> inspect and approve all foundation, retaining wall, and drainage geotechnical <br /> aspects of project construction. The consultant shall be present on site during <br /> grading and excavation operations. The results of the inspections and the as-built <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 17 of 30 <br />