Laserfiche WebLink
58. The applicant shall provide as-built drawings in AutoCAD 2010 or PDF prior to the <br /> release of the security bonds. <br /> Operation Services Center— Environmental Services/Utilities Division <br /> 59. The sewer line shall be private from the new manhole on St. John Street into the <br /> development. Prior to submitting to the Building and Safety Division for plan check, <br /> sheet C6 of Exhibit B shall be revised to reflect this requirement. <br /> Livermore-Pleasanton Fire Department <br /> 60. On-site access ways and internal drives, excluding the two guest parking spaces, <br /> shall be designated as fire lanes and identified as such by red curb striping and <br /> posted with signs. Signs shall be according to state standards and read "No <br /> Parking— Fire Lane." The red curb striping and sign location(s) and language shall <br /> be shown on the plans submitted to the Building and Safety Division for plan check <br /> and permit issuance and shall be subject to the review and approval of the Fire <br /> Department prior to issuance of building permits. <br /> Traffic Division <br /> 61. The curb cut that extends between 568 and 550 St. John Street, located on the <br /> west end of the project's frontage, shall be redesigned to include a new tapered <br /> edge on the east side of the curb cut located at 568 St. John Street. The redesign <br /> details shall be shown on the plans submitted to the Building and Safety Division <br /> for plan check and shall be subject to the review and approval of the Traffic Division <br /> and Engineering Department prior to issuance of permits. <br /> 62. Comprehensive traffic control measures shall be implemented during construction, <br /> including scheduling of major truck trips and deliveries, to avoid peak travel hours. <br /> If necessary, as determined by the Traffic Engineer, proper lane closure <br /> procedures such as flagger stations, signage, cones, and other warning devices <br /> shall be implemented during construction. <br /> 63. The haul route for all materials to and from the project site shall be approved by <br /> the City's Traffic Engineer prior to issuance of a building permit, and shall include <br /> the provision to monitor the street surfaces used for the haul route so that any <br /> damage and debris attributable to the haul trucks is identified and corrected at the <br /> expense of the project applicant or developer. <br /> 64. The plans submitted to the Building and Safety Division for plan check shall include <br /> improvement plans for this development that contain signage and striping details. <br /> Said improvement plans shall be subject to the review and approval of the City <br /> Traffic Engineer prior to building permit issuance. <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 12 of 30 <br />