My WebLink
|
Help
|
About
|
Sign Out
ORD 2150
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
9/28/2016 10:40:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/20/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2150
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23. The buildings covered by this approval shall comply with the current City of <br /> Pleasanton's Garbage Service's recycling and composting programs. The trash <br /> enclosure shall be sized to accommodate both trash and recycling containers. The <br /> trash and recycling containers shall be kept inside the enclosure at all times, <br /> except during pick-up times. The trash enclosure shall meet all City and Livermore <br /> Pleasanton Fire Department requirements. <br /> 24. All appliances and/or systems shall meet Energy Star standards. The appliance(s) <br /> or system(s) shall be stated on the plans submitted for issuance of a building permit. <br /> 25. All buildings shall be constructed to allow for future installation of a photovoltaic (PV) <br /> system and solar water heating systems. The project applicant shall comply with <br /> the following requirements for making all new dwelling units photovoltaic-ready and <br /> solar-water-heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic <br /> area to the building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an <br /> "inverter" required to convert the direct current output from the photovoltaic <br /> panels to alternating current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a <br /> structural engineer to accommodate the additional weight of a prototypical <br /> photovoltaic system beyond that anticipated for roofing; <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-water-heating tank. <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Director of Community Development for review and approval before issuance of the <br /> first building permit. The project developer shall provide the future owners the <br /> necessary information delineating the means by which photovoltaic panels can be <br /> applied to the roofs of the structures covered by this approval. This information shall <br /> be submitted to the Director of Community Development for review and approval <br /> prior to the occupancy of the first unit. <br /> 26. The project developer shall provide a construction plan with the building permit plan <br /> set for review and approval by the Director of Community Development and Chief <br /> Building Official before issuance of a building permit. The construction plan shall <br /> show the proposed location of materials and equipment storage, scaffolding, safety <br /> measures to protect the public from construction activities, temporary fencing, <br /> construction trailers, parking of construction vehicles, location of portable toilets, etc. <br /> Said plan shall be designed to minimize the loss of public parking spaces and, if any <br /> PUD-118 &P16-0203 4791 Augustine Street <br /> Draft Conditions of Approval 5 of 28 Mixed-Use Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.