My WebLink
|
Help
|
About
|
Sign Out
ORD 2150
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
9/28/2016 10:40:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/20/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2150
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.Concrete wash area: 1) locate wash out area away from storm <br /> drains and open ditches; 2) construct a temporary pit large <br /> enough to store the liquid and solid waste; 3) clean the pit by <br /> allowing concrete to set; 4) break up the concrete.; and then 5) <br /> recycle or dispose of properly. <br /> 11.Equipment and vehicle maintenance area at the project site is not <br /> permitted; use an off-site repair shop. <br /> b. Within 30 days of the installation and testing of the Stormwater treatment <br /> and hydro modification facilities, the designer of the site shall submit a letter <br /> to City Project Inspector/Construction Services Manager certifying the <br /> devices have been constructed in accordance with the approved plans for <br /> Stormwater and C3 design for the project. The letter shall request an <br /> inspection by City staff. <br /> Operation and Maintenance Requirements <br /> 126. The project shall comply with the operation and maintenance requirements of the <br /> NPDES Permit. All regulated projects (such as a residential subdivision projects) <br /> that create and/or replace 10,000 square feet or more of impervious areas shall <br /> enter into a recorded Stormwater Operation and Maintenance (O&M) Agreement <br /> for treating Stormwater runoff from the site in perpetuity. The agreement is <br /> required to be recorded at the Alameda County Recorder's Office in a format <br /> approved by the City. <br /> a. The Operation and Maintenance Agreement shall clarify that the property <br /> owner(s) of the site shall be responsible for the following in perpetuity: <br /> i. Maintaining all private Stormwater treatment measures on the <br /> project site. <br /> ii. Annually submitting a maintenance report to the City Operations <br /> Services Department, Utilities Division, addressing the <br /> implementation of the Operation and Maintenance Agreement <br /> requirements. <br /> The final Operation and Maintenance Agreement shall be submitted to the <br /> Engineering Division prior to the issuance of a grading or building permit, <br /> whichever comes first. The Agreement is subject to review and approval of the <br /> City Engineer/City Attorney, prior to recordation. <br /> 127. The Operation and Maintenance Agreement responsibilities shall include, but not <br /> be limited to the following: <br /> PUD-118&P16-0203 4791 Augustine Street <br /> Draft Conditions of Approval 27 of 28 Mixed-Use Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.