Laserfiche WebLink
65. The project developer shall provide root control barriers and four inch perforated <br /> pipes for parking lot trees, street trees, and trees in planting areas less than ten <br /> feet in width, as determined necessary by the Director of Community Development <br /> at the time of review of the final landscape plans. <br /> 66. For purposes of erosion control, the applicant/developer shall plant a hydroseed <br /> mixture that has been designed by the project Landscape Architect. The <br /> hydroseed mixture shall be specified on the building permit plans for review and <br /> approval by the Director of Community Development and shall be maintained by <br /> the applicant/developer. <br /> 67. Prior to building occupancy, the landscape architect or landscape designer shall <br /> certify in writing to the Director of Community Development that the landscaping has <br /> been installed in accordance with the approved landscape and irrigation plans with <br /> respect to size, number, and species of plants and overall design concept. <br /> 68. The developer and future property owners are encouraged to use reclaimed gray <br /> water, rain water, etc., for landscape irrigation. If used, the details shall be shown <br /> on the permit plan set to the satisfaction of the Director of Community Development <br /> before issuance of a building permit. <br /> 69. The developer and/or future property owners are encouraged to use best <br /> management practices for the use of pesticides and herbicides. <br /> Tree Requirements <br /> 70. The project developer shall comply with the recommendations of the tree report <br /> prepared, dated "January 13, 2016." No tree trimming or pruning other than that <br /> specified in the tree report shall occur. The project developer shall arrange for the <br /> horticultural consultant to conduct a field inspection prior to issuance of City <br /> permits to ensure that all recommendations have been properly implemented. A <br /> certified arborist shall be on-site during excavation within the tree driplines to <br /> provide recommendations and ensure that tree protection measures have been <br /> followed. The consultant shall certify in writing that such recommendations have <br /> been followed. <br /> 71. The project developer shall post cash, letter of credit, or other security satisfactory <br /> to the Director of Community Development for the appraised value of each tree <br /> (tree Nos. 90 and 91 in the Traverso Tree Service report on file with the Planning <br /> Division) required to be preserved. This cash bond or security shall be retained <br /> for two years following acceptance of public improvements or completion of <br /> construction, whichever is later, and shall be forfeited if the trees are destroyed or <br /> substantially damaged. No trees shall be removed other than those specifically <br /> designated for removal on the approved plans or tree report. <br /> PUD-118 &P16-0203 4791 Augustine Street <br /> Draft Conditions of Approval 13 of 28 Mixed-Use Development <br />