My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
092016
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:08:00 PM
Creation date
9/15/2016 3:24:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/20/2016
DESTRUCT DATE
15Y
DOCUMENT NO
07
Document Relationships
07 ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\092016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
water supply type (potable, recycled, well, greywater, combination of <br />potable /greywater); and applicant signature /date with the statement that "I <br />agree to comply with the requirements of the prescriptive compliance option <br />of the Water Efficient Landscape Ordinance." <br />b. Landscape Plan documenting: incorporation of compost at a rate of at least <br />4 cubic yards /1,000 square feet; compliance with the plant material criteria; <br />compliance with the turf criteria; and compliance with the irrigation system <br />criteria. <br />Green Building and Water Conservation <br />24. The current State of California's Green Building Standards Code, "CALGreen," shall <br />apply, as applicable. <br />25. A minimum of one appliance or system that meets Energy Star standards shall be <br />installed in each residential unit as part of the project. The appliance(s) or system(s) <br />shall be stated on the plans submitted for issuance of a building permit. <br />26. All new buildings shall be constructed to allow for future installation of a photovoltaic <br />(PV) system and solar water heating systems. The project applicant shall comply <br />with the following requirements for making all new dwelling units photovoltaic -ready <br />and solar- water - heating- ready: <br />a. Electrical conduit and cable pull strings shall be installed from the roof /attic <br />area to the building's main electrical panels; <br />b. An area shall be provided near the electrical panel for the installation of an <br />"inverter" required to convert the direct current output from the photovoltaic <br />panels to alternating current; <br />c. Engineer the roof trusses to handle an additional load as determined by a <br />structural engineer to accommodate the additional weight of a prototypical <br />photovoltaic system beyond that anticipated for roofing; <br />d. Plumbing shall be installed for solar -water heating; and <br />e. Space shall be provided for solar- water - heating tank. <br />These measures shall be shown on the building permit plan set submitted to the <br />Director of Community Development for review and approval before issuance of the <br />first building permit. The project developer shall provide the future owners the <br />necessary information delineating the means by which photovoltaic panels can be <br />applied to the roofs of the structures covered by this approval. This information shall <br />be submitted to the Director of Community Development for review and approval <br />prior to the occupancy of the first unit. <br />P16 -1201, P16 -1202 & PUD -120, Catalyst Development City Council <br />Page 6 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.