Laserfiche WebLink
construction, the project developer shall mark all trash disposal bins "trash <br />materials only" and all recycling bins "recycling materials only." The project <br />developer shall contact Pleasanton Garbage Service for the disposal of all waste <br />from the site. <br />Engineering Division <br />79. A "Conditions of Approval" checklist shall be completed and attached to all plan <br />checks submitted for approval indicating that all conditions have been satisfied. <br />80. The project developer shall comply with the recommendations of the project's <br />geotechnical consultant. The project developer's geotechnical consultant shall <br />review and approve all foundation, retaining wall, and drainage geotechnical <br />aspects of the final development plans to ensure that the recommendations have <br />been properly incorporated into the development. The consultant shall certify by <br />writing on the plans, or as otherwise acceptable to the City Engineer, that the final <br />development plan is in conformance with the geotechnical report approved with <br />the project. <br />81. The project developer shall arrange and pay for the geotechnical consultant to <br />inspect and approve all foundation, retaining wall, and drainage geotechnical <br />aspects of project construction. The consultant shall be present on site during <br />grading and excavation operations. The results of the inspections and the as -built <br />conditions of the project shall be certified in writing by the geotechnical consultant <br />for conformance to the approved plans and geotechnical report and submitted to <br />the City Engineer for review and approval prior to occupancy. <br />82. The project developer shall construct vertical P.C.C. curbs and gutters within this <br />development unless otherwise approved by the City Engineer. When the sidewalk <br />is adjacent to the curb and gutter, they shall be poured monolithically. <br />83. A water meter shall be provided to each lot of record within the development. <br />84. A sanitary sewer lateral with two -way cleanout (located at the back of the sidewalk <br />or curb, whichever is applicable) shall be provided to each lot of record within the <br />development unless otherwise approved by the City Engineer. <br />85. All existing service drops (PG &E Pac Bell and Cable TV) to existing homes and <br />new services to proposed units within this development shall be installed <br />underground in conduit to the nearest "utility approved" riser pole. The project <br />developer shall also be responsible for paying a pro -rata share as determined by <br />the City Engineer for undergrounding of the overhead utility lines across the project <br />frontage. Said payment shall be due prior to the approval of the final map. <br />86. All dry utilities (electric power distribution, gas distribution, communication service, <br />cable television, street lights and any required alarm systems) required to serve <br />PUD -118 & P16 -0203 4791 Augustine Street <br />Draft Conditions of Approval 15 of 28 Mixed -Use Development <br />