Laserfiche WebLink
Engineering Department <br />47. The project developer /owner shall grant an easement to the City over those <br />parcels needed for public service easements (P.S.E.) and which are approved by <br />the City Engineer, or other easements, which may be designated by the City <br />Engineer. <br />48. All landscaping within the public right -of -way along the project's frontage shall be <br />maintained by the homeowners /maintenance association unless otherwise <br />approved by the City Engineer. Necessary irrigation system, irrigation water <br />meter, irrigation valves, irrigation controller, etc. shall been included on the plan <br />for maintenance of all landscaping within the public right -of -way. <br />Traffic Division <br />49. The applicant or responsible party shall pay any traffic impact fees for the mixed - <br />use development as determined by the City Traffic Engineer. This fee shall be <br />paid prior to issuance of a building permit. <br />50. Comprehensive traffic control measures shall be implemented during construction, <br />including scheduling of major truck trips and deliveries, to avoid peak travel hours. <br />If necessary, as determined by the Traffic Engineer, proper lane closure <br />procedures such as flagger stations, signage, cones, and other warning devices <br />shall be implemented during construction. <br />51. The haul route for all materials to and from the project site shall be approved by <br />the City's Traffic Engineer prior to issuance of a building permit, and shall include <br />the provision to monitor the street surfaces used for the haul route so that any <br />damage and debris attributable to the haul trucks is identified and corrected at the <br />expense of the project applicant or developer. <br />52. The plans submitted to the Building and Safety Division for plan check shall include <br />improvement plans for this development that contain signage and striping details. <br />Said improvement plans shall be subject to the review and approval of the City <br />Traffic Engineer prior to building permit issuance. <br />STANDARD CONDITIONS <br />Planning Division <br />53. The proposed Planned Unit Development Plan shall conform substantially to the <br />project plans and color palette, Exhibit B, dated "Received August 16, 2016," and <br />arborist report, Exhibit B, dated "Received January 21, 2016," on file with the <br />Planning Division, except as modified by the following conditions of approval. <br />Minor changes to the plans may be allowed subject to the approval of the Director <br />of Community Development if found to be in substantial conformance to the <br />approved exhibits. <br />PUD -118 & P16 -0203 4791 Augustine Street <br />Draft Conditions of Approval 10 of 28 Mixed -Use Development <br />