Laserfiche WebLink
a. The Operation and Maintenance Agreement shall clarify that the property <br /> owner(s) of the site shall be responsible for the following in perpetuity: <br /> i. Maintaining all private stormwater treatment measures on the project <br /> site. <br /> ii. Annually submitting a maintenance report to the City Operations <br /> Services Department, Utilities Division, addressing the <br /> implementation of the Operation and Maintenance Agreement <br /> requirements. <br /> The final Operation and Maintenance Agreement shall be submitted to the <br /> Engineering Division prior to the issuance of a grading or building permit, <br /> whichever comes first. The Agreement is subject to review and approval of the <br /> City Engineer/City Attorney, prior to recordation. <br /> 127. The Operation and Maintenance Agreement responsibilities shall include, but not <br /> be limited to the following: <br /> a. Repainting text near the drain inlets to state "No Dumping — Drains to <br /> Bay." <br /> b. Ensuring maintenance of landscaping with minimal pesticide and fertilizer <br /> use. <br /> c. Ensuring no one is disposing of vehicle fluids and hazardous materials or <br /> rinse water from cleaning tools, equipment or parts into storm drains. <br /> d. Cleaning all on-site storm drains at least twice a year with one cleaning <br /> immediately prior to the rainy season. The City may require additional <br /> cleanings. <br /> e. Mowing and removing clippings from vegetated swales with grasses on a <br /> regular basis. <br /> (end) <br /> PUD-118 &P16-0203 4791 Augustine Street <br /> Draft Conditions of Approval 27 of 27 Mixed-Use Development <br />