My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
090616
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:49:21 PM
Creation date
8/31/2016 3:01:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/6/2016
DESTRUCT DATE
15Y
DOCUMENT NO
13
Document Relationships
13 ATTACHMENT 3
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\090616
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The project developer shall include erosion control/stormwater <br /> quality measures on the project grading plan which shall <br /> specifically address measures to prevent soil, dirt, and debris <br /> from entering the public storm drain system. Such measures may <br /> include, but are not limited to, hydroseeding, hay bales, <br /> sandbags, and siltation fences and shall be subject to the review <br /> and approval of the City Engineer/Chief Building Official. If no <br /> grading plan is required, necessary erosion control/stormwater <br /> quality measures shall be shown on the site plan submitted for a <br /> building permit, and shall be subject to the review and approval <br /> of the Building and Safety Division. The project developer is <br /> responsible for ensuring that the contractor is aware of and <br /> implements such measures. <br /> 2. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading, but in no case later than October 15. <br /> Hydroseeding shall be accomplished before September 15 and <br /> irrigated with a temporary irrigation system to ensure that the <br /> vegetated areas are established before October 15. No grading <br /> shall occur between October 15 and April 15 unless approved <br /> erosion control/stormwater quality measures are in place, subject <br /> to the approval of City Engineer/Chief Building Official. Such <br /> measures shall be maintained until such time as permanent <br /> landscaping is in place. <br /> 3. Gather all sorted construction debris on a regular basis and place <br /> in the appropriate container for recycling; to be emptied at least <br /> on a weekly basis. When appropriate, use tarps on the ground <br /> to collect fallen debris or splatters that could contribute to <br /> stormwater runoff pollution. <br /> 4. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br /> street pavement and storm drains adjoining the site. Limit <br /> construction access routes onto the site and place gravel on <br /> them. Do not drive vehicles and equipment off paved or graveled <br /> areas during wet weather. Broom sweep the street pavement <br /> adjoining the project site on a daily basis. Scrape caked on mud <br /> and dirt from these areas before sweeping. <br /> 5. Install filter materials (such as sandbags, filter fabric, etc.) at the <br /> storm drain inlet nearest the downstream side of the project site <br /> in order to retain any debris or dirt flowing in the storm drain <br /> system. Maintain and/or replace filter materials to ensure <br /> effectiveness and to prevent street flooding. <br /> PUD-118 &P16-0203 4791 Augustine Street <br /> Draft Conditions of Approval 25 of 27 Mixed-Use Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.