My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
090616
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:49:21 PM
Creation date
8/31/2016 3:01:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/6/2016
DESTRUCT DATE
15Y
DOCUMENT NO
13
Document Relationships
13 ATTACHMENT 3
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\090616
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building and Safety Division <br /> 76. All retaining walls higher than four feet from the top of the wall to the bottom of the <br /> footway shall be constructed of reinforced concrete, masonry, or other material as <br /> approved by the Director of Community Development, or shall be an approved crib <br /> wall type. Calculations signed by a registered civil engineer shall accompany the <br /> wall plans. <br /> 77. At the time of building permit plan submittal, the project developer shall submit a <br /> final grading and drainage plan prepared by a licensed civil engineer depicting all <br /> final grades and on-site drainage control measures to prevent stormwater runoff <br /> onto adjoining properties. <br /> 78. Prior to issuance of building permits, the applicant shall submit a waste <br /> management plan to the Building and Safety Division. The plan shall include the <br /> estimated composition and quantities of waste to be generated and how the project <br /> developer intends to recycle at least 75 percent of the total job site construction <br /> waste measured by weight or volume. Proof of compliance shall be provided to <br /> the Chief Building Official prior to the issuance of a final building permit. During <br /> construction, the project developer shall mark all trash disposal bins "trash <br /> materials only" and all recycling bins "recycling materials only." The project <br /> developer shall contact Pleasanton Garbage Service for the disposal of all waste <br /> from the site. <br /> Engineering Division <br /> 79. A "Conditions of Approval" checklist shall be completed and attached to all plan <br /> checks submitted for approval indicating that all conditions have been satisfied. <br /> 80. The project developer shall comply with the recommendations of the project's <br /> geotechnical consultant. The project developer's geotechnical consultant shall <br /> review and approve all foundation, retaining wall, and drainage geotechnical <br /> aspects of the final development plans to ensure that the recommendations have <br /> been properly incorporated into the development. The consultant shall certify by <br /> writing on the plans, or as otherwise acceptable to the City Engineer, that the final <br /> development plan is in conformance with the geotechnical report approved with <br /> the project. <br /> 81. The project developer shall arrange and pay for the geotechnical consultant to <br /> inspect and approve all foundation, retaining wall, and drainage geotechnical <br /> aspects of project construction. The consultant shall be present on site during <br /> grading and excavation operations. The results of the inspections and the as-built <br /> conditions of the project shall be certified in writing by the geotechnical consultant <br /> for conformance to the approved plans and geotechnical report and submitted to <br /> the City Engineer for review and approval prior to occupancy. <br /> PUD-118 &P16-0203 4791 Augustine Street <br /> Draft Conditions of Approval 14 of 27 Mixed-Use Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.