Laserfiche WebLink
b. All cut and fill slopes shall be revegetated and stabilized after completion of <br /> grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary irrigation <br /> system to ensure that the grasses are established before October 15. No <br /> grading shall occur between October 15 and April 15 unless approved erosion <br /> control/stormwater quality measures are in place, subject to the approval of City <br /> Engineer/Chief Building Official. Such measures shall be maintained until such <br /> time as permanent landscaping is place. <br /> c. Gather all sorted construction debris on a regular basis, place it in the <br /> appropriate container for recycling, and empty at least on a weekly basis. When <br /> appropriate, use tarps on the ground to collect fallen debris or splatters that could <br /> contribute to stormwater runoff pollution. <br /> d. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access routes <br /> onto the site and place gravel on them. Do not drive vehicles and equipment off <br /> paved or graveled areas during wet weather. Broom sweep the street pavement <br /> adjoining the project site on a daily basis. Scrape caked-on mud and dirt from <br /> these areas before sweeping. <br /> e. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or <br /> dirt flowing in the storm drain system. Maintain and/or replace filter materials to <br /> ensure effectiveness and to prevent street flooding. <br /> f. Create a contained and covered area on the site for the storage of cement, <br /> paints, oils, fertilizers, pesticides, or other materials used on the site that have <br /> the potential of being discharged into the storm drain system through being <br /> windblown or in the event of a material spill. <br /> g. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br /> street, gutter, or storm drain. <br /> h. Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br /> discharge wash water into street, gutters, or storm drains. <br /> i. Equipment fueling area: Use off-site fueling stations as much as possible. Where <br /> on-site fueling occurs, use designated areas away from the storm drainage <br /> facility, use secondary containment and spill rags when fueling, discourage <br /> "topping off' of fuel tanks, place a stockpile of absorbent material where it will be <br /> readily accessible, and check vehicles and equipment regularly for leaking oils <br /> and fuels. Dispose rags and absorbent materials promptly and properly. <br /> Case No. PUD-114, 11300 Dublin Canyon City Council <br /> Page 24 of 26 <br />