Laserfiche WebLink
2. The amendments to the SWPPP and all the inspection forms shall be completed <br /> and available at the site for inspection by the city, county or state staff. <br /> 3. The applicants are responsible for implementing the following Best Management <br /> Practices (BMPs). These, as well as any other applicable measures, shall be <br /> included in the SWPPP and implemented as approved by City. <br /> a) The applicants shall include erosion control/stormwater quality measures on <br /> the project grading plan which shall specifically address measures to prevent <br /> soil, dirt, and debris from entering the public storm drain system. Such <br /> measures may include, but are not limited to, hydroseeding, hay bales, <br /> sandbags, and siltation fences and shall be subject to the review and approval <br /> of the City Engineer/Chief Building Official. If no grading plan is required, <br /> necessary erosion control/stormwater quality measures shall be shown on the <br /> site plan submitted for a building permit, and shall be subject to the review and <br /> approval of the Building and Safety Division. The applicants are responsible <br /> for ensuring that the contractor is aware of and implements such measures. <br /> b) All cut and fill slopes shall be revegetated and stabilized after completion of <br /> grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary irrigation <br /> system to ensure that the vegetated areas are established before October 15. <br /> No grading shall occur between October 15 and April 15 unless approved <br /> erosion control/stormwater quality measures are in place, subject to the <br /> approval of City Engineer/Chief Building Official. Such measures shall be <br /> maintained until such time as permanent landscaping is in place. <br /> c) Gather all sorted construction debris on a regular basis and place in the <br /> appropriate container for recycling; to be emptied at least on a weekly basis. <br /> When appropriate, use tarps on the ground to collect fallen debris or splatters <br /> that could contribute to stormwater runoff pollution. <br /> d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access routes <br /> onto the site and place gravel on them. Do not drive vehicles and equipment <br /> off paved or graveled areas during wet weather. Broom sweep the street <br /> pavement adjoining the project site on a daily basis. Scrape caked on mud and <br /> dirt from these areas before sweeping. <br /> e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br /> inlet nearest the downstream side of the project site in order to retain any debris <br /> or dirt flowing in the storm drain system. Maintain and/or replace filter materials <br /> to ensure effectiveness and to prevent street flooding. <br /> f) Create a contained and covered area on the site for the storage of cement, <br /> paints, oils, fertilizers, pesticides, or other materials used on the site that have <br /> the potential of being discharged into the storm drain system by being <br /> windblown or by being spilled. <br /> g) Never clean machinery, equipment, tools, brushes, or rinse containers into a <br /> street, gutter, or storm drain. <br /> PUD-116, Berlogar Page 13 <br />