DISCUSSION <br /> The annual assessments can be adjusted each year by the ENR Construction Cost Index <br /> for the San Francisco Bay Area. The current index allows for an increase of two percent. <br /> The allowed ENR adjustment is stated within each GHAD's original creation documents <br /> and is therefore compliant with Proposition 218 requirements. <br /> Oak Tree Farm <br /> An Engineer's Report for the Oak Tree Farm CHAD has been prepared. It concludes that <br /> funding is needed for the following on-going special services for properties within this <br /> CHAD: cleaning of retention basins, site inspections, erosion stabilization, preparation of <br /> the Engineer's Report, and City administrative costs. This year the parcel assessment <br /> has been increased two percent according to the index (to $304). With 42 properties <br /> within the CHAD, including the City-owned sanitary sewer pump station, this year's <br /> projected revenue will be $13,268. The anticipated operational expenses this year will <br /> total $11,486, leaving $1,782 to be deposited into the reserve fund. <br /> As of May 3, 2016, the Oak Tree Farm CHAD has a fund reserve balance of $79,132. <br /> This reserve is to be used to pay for landslide repair work, which the original Plan of <br /> Control estimated would be needed approximately every ten years. This reserve is slowly <br /> being replenished because over the last several years the majority of the reserve funds <br /> were used to complete erosion repairs along the fire trail within the covered area. Should <br /> a significant event occur this amount is likely inadequate to cover the cost of needed <br /> repairs. <br /> Moller Ranch <br /> The Engineer's Report for the Moller Ranch CHAD concludes that funding is needed for <br /> the following special services for properties within this CHAD: excavation and re- <br /> compaction of shallow slope failures, installation of additional subdrain systems, repair of <br /> surface drainage improvements, construction of additional surface drainage <br /> improvements, restoration of eroded areas and/or removal of siltation deposits, site <br /> inspection, preparation of the Engineer's Report and City administrative costs. This year <br /> the parcel assessment has been increased two percent according to the index (to $114). <br /> With 100 properties within the CHAD, including the City-owned water reservoir site, this <br /> year's projected revenue will be $12,200. The anticipated operational expenses this year <br /> will total $10,556, leaving $1,644 to be deposited into the fund reserve. <br /> As of May 3, 2016, the Moller Ranch GHAD has a fund reserve balance of$114,385. This <br /> reserve is for the repair of landslides, hillside slopes and drainage facilities, as may be <br /> necessary in the future, based on estimates of significant earth movement events <br /> discussed in the original Plan of Control for this CHAD. These reserves can also be used <br /> for the eventual replacement infrastructure should it become necessary. Should a <br /> significant event occur this reserve amount is likely inadequate to cover the cost of <br /> needed repairs. <br /> Page 3 of 5 <br />