Laserfiche WebLink
47.As shown on the PUD plan sheet 3 of 4, the existing 8" sanitary sewer and existing <br /> 8" fire service are private. These improvements may be accepted by the City <br /> Engineer as public lines if they meet the City of Pleasanton and California <br /> Department of Health Services standards, including but not limited to, horizontal <br /> separation between the public water main and public sewer main, inspection and <br /> testing, maintenance access, material and backfill, etc. <br /> 48.If the existing 8" sanitary sewer and existing 8" fire service are accepted as public <br /> sanitary sewer and water mains, the developer shall provide documentation <br /> acceptable to the City Engineer that shows the private road is adequate to serve City <br /> maintenance vehicles or the private road shall be rehabilitated or reconstructed to <br /> serve City maintenance vehicles. <br /> 49.If the existing water and sewer mains cannot meet the City of Pleasanton and <br /> California Department of Health Services standards, separate water and sewer <br /> laterals shall be installed at the end of existing public mains to serve the proposed <br /> lots. <br /> Building and Safety Division <br /> 50.Prior to issuance of a building permit, the applicants shall pay the applicable Zone 7 <br /> and City connection fees and water meter cost for any water meters, including <br /> irrigation meters. Additionally, the applicants shall pay any applicable DSRSD sewer <br /> permit fee. <br /> URBAN STORMWATER CONDITIONS OF APPROVAL <br /> 51.The project shall comply with the NPDES Permit No. CAS612008 (Order No. R2- <br /> 2015-0049), dated November 19, 2015, and amendments, issued the by California <br /> Regional Water Quality Control Board, San Francisco Bay Region. A copy is available <br /> for viewing with the Engineering Department, Development Services Section located <br /> at City hall. A digital copy is also available on the State Water Board Website: <br /> http://www.waterboa rds.ca.gov/sanfranciscobay/water_issues/programs/stormwater/ <br /> Municipal/i ndex.shtm l <br /> The project shall comply with the State Issued Construction General Permit Number <br /> 2009-0009 (Effective July 1, 2010) and amendments, as required by the San <br /> Francisco Bay Regional Water Quality Control Board. A digital copy is also available <br /> on the State Water Board Website: <br /> http://www.swrcb.ca.gov/water_issues/programs/stormwater/constperm its.shtm I <br /> A.Design Requirements <br /> PUD-116, Berlogar Page 10 <br />