My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
060716
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:26:25 PM
Creation date
6/1/2016 8:46:20 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2016
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recorder's office by the City Clerk, which occurs following the acceptance of all <br /> public improvements by the City Council. <br /> 15.The project developer shall provide a quitclaim deed with legal description(s) and <br /> plat(s) for the abandonment of public easements as determined by the City <br /> Engineer. The quitclaim deed is subject to review and recommendation by the City <br /> Engineer to the City Council for approval and recordation by the City Clerk's office. <br /> 16.The private sanitary sewer lateral from the building shall have a grease interceptor <br /> subject to the satisfaction of the City Engineer. <br /> Traffic Engineering <br /> 17.If determined to be necessary by the City Traffic Engineer, Workday shall work with <br /> the City and BART to design and install a pedestrian/bicycle warning device/signal <br /> where the pedestrian/bicycle pathway on the east side of the BART garage crosses <br /> the new drive aisle into the east side of BART garage. <br /> 18.Workday shall diligently pursue with Nordstrom the possibility of installing a bus stop <br /> and turnout on the Nordstrom side of Stoneridge Mall Road generally opposite the <br /> BART property. If the installation of the bus stop is acceptable to Nordstrom, <br /> Workday shall install the bus stop, turnout, and associated improvements prior to <br /> occupancy of the office building. <br /> 19.Prior to occupancy of the office building, the applicant shall install a traffic signal and <br /> associated improvements at the Workday driveway and Stoneridge Mall Road <br /> intersection. Details of said traffic signal and associated improvements shall be <br /> shown on the plans submitted for issuance of building permits and shall be subject <br /> to the review and approval by the Traffic Engineer and Director of Community <br /> Development prior to issuance of building permits for the project. <br /> Fire Department <br /> 20.The sprinkler risers for the office building and parking garage shall be fed from the <br /> discharge side of the fire pump with Fire Department Connections (FDC's) installed <br /> to isolate each sprinkler system. Construction documents showing this revision shall <br /> be subject to the review and approval by the Fire Marshal prior to issuance of a <br /> building permit. <br /> 21.Two additional fire hydrants shall be installed at the north and south entrances to the <br /> basement tunnel at locations subject to the approval by the Fire <br /> Marshal. Construction documents showing this revision shall be subject to the <br /> review and approval by the Fire Marshal prior to issuance of a building permit. <br /> 22.The parking structure and office building shall have emergency radio coverage in <br /> accordance with section 510 of the fire code. Details of compliance shall be shown <br /> 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.