Laserfiche WebLink
c. All site improvements and construction activities shall be limited to the hours <br /> of 8:00 a.m. to 5:00 p.m., Monday through Friday. In addition, no construction <br /> shall be allowed on State and federal holidays, Saturdays, or Sundays. The <br /> Community Development Director may allow earlier "start times" for specific <br /> construction activities (e.g., concrete foundation/floor pouring), if it can be <br /> demonstrated to the satisfaction of the Community Development Director that <br /> the construction and construction traffic noise will not affect nearby residents. <br /> Prior to construction, the hours of construction shall be posted on site. <br /> d. All construction equipment must meet DMV and City noise standards and <br /> shall be equipped with muffling devices. <br /> e. Designate a noise disturbance coordinator who will be responsible for <br /> responding to complaints about noise during construction. The telephone <br /> number of the noise disturbance coordinator shall be conspicuously posted at <br /> the construction site and shall be provided to the City of Pleasanton. Copies <br /> of the construction schedule shall also be posted at nearby noise sensitive <br /> areas. <br /> f. Construction activities conducted on the subject property shall not exceed <br /> 86 dBA at any point outside of the property plane of the subject property <br /> (Pleasanton Municipal Code Section 9.04.100.B.). <br /> These requirements shall be printed on the construction plans to the satisfaction of <br /> the Director of Community Development. <br /> 26. Rain gutters shall discharge into landscaping planter areas where feasible. These <br /> details shall be shown on the plans submitted to the Building and Safety Division <br /> for plan check and are subject to the review and approval of the Director of <br /> Community Development prior to building permit issuance. <br /> 27. The project shall comply with the State of California Model Water Efficient <br /> Landscape Ordinance and Bay Friendly Basics Landscape Checklist. Prior to <br /> issuance of a Building Permit, the applicant shall submit the following <br /> documentation to the Planning Division: <br /> a. Landscape Documentation Package, which includes date; project <br /> applicant/contact information; project address; total landscape area; project <br /> type (new, rehabilitated, public, private, cemetery, homeowner-installed); <br /> water supply type (potable, recycled, well, greywater, combination of <br /> potable/greywater); and applicant signature/date with the statement that "I <br /> agree to comply with the requirements of the prescriptive compliance option <br /> of the Water Efficient Landscape Ordinance." <br /> b. Landscape Plan documenting: incorporation of compost at a rate of at least <br /> 4 cubic yards/1,000 square feet; compliance with the plant material criteria; <br /> Page 5 of 17 <br />