My WebLink
|
Help
|
About
|
Sign Out
ORD 2142
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
5/17/2016 2:08:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
5/3/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2142
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The amendments to the SWPPP and all the inspection forms shall be <br /> completed and available at the site for inspection by the city, county or state <br /> staff. <br /> 3. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measure, shall be included in the SWPPP and implemented as approved by <br /> the City. <br /> a) The project developer shall include erosion control/stormwater quality <br /> measures on the final grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the storm drain <br /> system. Such measures may include, but are not limited to, <br /> hydroseeding, hay bales, sandbags, and siltation fences and are subject <br /> to the review and approval of the City Engineer/Chief Building Official. If <br /> no grading plan is required, necessary erosion control/stormwater quality <br /> measures shall be shown on the site plan submitted for an on-site permit, <br /> subject to the review and approval of the Building and Safety Division. <br /> The project developer is responsible for ensuring that the contractor is <br /> aware of and implements such measures. <br /> b) All cut and fill slopes shall be revegetated and stabilized after completion <br /> of grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary <br /> irrigation system to ensure that the grasses are established before <br /> October 15. No grading shall occur between October 15 and April 15 <br /> unless approved erosion control/stormwater quality measures are in place, <br /> subject to the approval of City Engineer/Chief Building Official. Such <br /> measures shall be maintained until such time as permanent landscaping is <br /> place. <br /> c) Gather all sorted construction debris on a regular basis, place it in the <br /> appropriate container for recycling, and empty at least on a weekly basis. <br /> When appropriate, use tarps on the ground to collect fallen debris or <br /> splatters that could contribute to stormwater runoff pollution. <br /> d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked-on mud and dirt from these areas before sweeping. <br /> e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> 25 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.