My WebLink
|
Help
|
About
|
Sign Out
ORD 2142
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
5/17/2016 2:08:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
5/3/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2142
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
46. The offsite sanitary sewer main and water main shall be a size acceptable to the <br /> City Engineer and Director of Operations. The City will reimburse the developer in <br /> an amount determined by the City Engineer for the design and construction of the <br /> City's share of the off-site sewer and water improvements per the reimbursement <br /> agreement approved by the City Council. <br /> 47. The precast wall and its foundation along Rose Avenue shall not encroach onto <br /> Alameda County Fairground's property. <br /> 48. The applicant/project developer shall convey Parcel A by separate instrument to <br /> the homeowners association. The homeowners association shall maintain the <br /> landscaping, creek bank, irrigation, fencing, and the public trail and all <br /> appurtenances within Parcel A. <br /> 49. The applicant/project developer shall dedicate a public trail easement on Parcel A <br /> on the final map. <br /> 50. The applicant/project developer's contractor shall protect Arroyo del Valle Creek <br /> during all construction activities. A $15,000 bond shall be posted with the City <br /> Engineer to ensure compliance with this requirement. Protection measures shall be <br /> described in detail on the on-site grading and utility improvement plans and any <br /> other construction or building plans to the satisfaction of the City Engineer prior to <br /> the start of construction. <br /> 51. Any damage to existing street improvements, including the central island at the <br /> intersection of Rose Avenue and White Stable Drive (the roundabout), during <br /> construction on the subject property shall be repaired to the satisfaction of the City <br /> Engineer at full expense to applicant/project developer and includes but is not <br /> limited to slurry seal, overlay, restoration of landscaping and irrigation system, <br /> signing, striping, pavement marking, concrete or street reconstruction if deemed <br /> warranted by the City Engineer. <br /> 52. The recorded deed of sale for lots 14, 15 and 16 shall include a disclosure that lots <br /> 17, 18 and 19 will be constructed in a future phase, Phase II. Wording for this <br /> disclosure shall be written in simple/plain language, shall be submitted to the City <br /> Attorney for review and approval before City Council approval of the final map, and <br /> shall be recorded over lots 14, 15, and 16 by separate instrument. <br /> 53. The on-site grading and utility improvement plans shall clearly show all Phase II <br /> work to the satisfaction of the City Engineer. <br /> 54. The applicant/project developer's engineer shall submit as-built drawings of off-site <br /> sewer & water Improvement plans, on-site grading and utility improvement plans <br /> and joint trench plans in AutoCAD 2010 and pdf format acceptable to the City <br /> 9 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.