My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
051716
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:50:45 PM
Creation date
5/12/2016 8:34:48 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/17/2016
DESTRUCT DATE
15Y
DOCUMENT NO
15
Document Relationships
15 ATTACHMENT 2 EXHIBIT B - Project Narrative
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
15 ATTACHMENT 2 EXHIBIT B - Proposed Plans
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
15 ATTACHMENT 2 EXHIBIT B - Traffic Study
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
15 ATTACHMENT 2 EXHIBIT B - Tree Reports
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
15 ATTACHMENT 4 EXHIBIT D
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Program to promote alternative commutes (e.g., designating carpool spaces, improving <br /> pedestrian and bicycle access between the BART station and office building, installing bicycle <br /> storage and showers, providing incentive-based programs for employees), staff believes many <br /> employees will not drive to work. Therefore, staff can support the small, 1.4 percent <br /> (45-space) reduction to the Code parking requirement for non-PUD zones. <br /> The six-level (plus one basement level) parking garage would have a maximum height of <br /> approximately 75 feet four inches as measured at the top of the elevator penthouse and <br /> approximately 60 feet 10 inches at the top of the parapet. The parking structure would feature <br /> concrete walls with vertical reveals and perforated metal panels on the north, south, and west <br /> elevations to add architectural interest and screen the cars. The holes in the northern <br /> perforated panel facing 1-580 would be arranged to artistically depict Workday's name/logo and <br /> clouds. The perforated panels on the south and west elevations would have geometric <br /> patterns to add interest. A photovoltaic array would be located on the roof to generate energy <br /> and provide shade to vehicles parked on the roof. "Greenscreens" (i.e., wire mesh frames with <br /> landscaping trained to grow on them) would be located along the first floors. <br /> Figure 7: Photo Simulation of Parking Garage from West Dublin/Pleasanton BART Station <br /> i <br /> ;i. r <br /> J <br /> is s _ {_ _ <br /> Given its prominence along the 1-580 frontage, staff required the applicant to provide greater <br /> detailing for the modified parking garage design. Staff believes that the revised design of the <br /> parking garage is a significant improvement over the design of the original parking structures. <br /> The perforated metal panels add an attractive visual element and provide better screening of <br /> parked cars (in general and relative to the previously approved parking structure). While the <br /> revised garage is taller than the approved northern garage, staff believes that the improved <br /> design helps mitigate its mass. Additionally, the parking garage has been set back an <br /> additional 10 feet from the northern property line compared to the approved garage (from <br /> PUD-104-1M/PUD-81-22-15M, 6110/6120-6160 Stoneridge Mall Road Planning Commission <br /> Page 9 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.